Mueller Jones J6000 Series Installation Instructions Download Page 1

J6000 SERIES BREAK CHECK VALVE

Installation Instructions

NOTE:

 

The break check valve and wet barrel hydrant must be installed and maintained according to AWWA M17,  

C503, C600, and applicable local codes.

  

Do not

 use this product on wet barrel fire hydrants that have an internal diameter greater than 6-5/8"  

(see Danger Tag on product for more information). Do not use break-away bolts with Traffic Flange.

8"

6.75"

2.00"

BURY LINE

A.

 Upon receipt of shipment, inspect J-6000 valve assembly to ensure no damage or breakage occurred during shipment.

B.

 Install FLANGE GASKET onto BURY SECTION FLANGE. Set J-6000 FLANGE on BURY SECTION FLANGE; plumb, install  

and tighten fasteners to pipe manufacturer specified torque.

C.

 Make sure the O-RING is in the O-ring groove on the traffic side of the J-6000, the Discs are vertical and ARMS are  

in the J-6000 Body POCKETS.

D.

 Set hydrant on the J-6000 and orient the pumper to the desired direction.

Reviews: