Controller connection
MTS Exceed™ 22 Series Product Information
Installation
33
Controller connection
Connecting to the Main Power Source
Main unit
Input power of MTS Exceed 22 series pendulum impact tester adopts three-hole
I-type socket (C13 type). Specifications of power cord are H05VV-F, 3G1mm2,
which are in compliance with KEMA-KEUR, CEBEC, +S+S+S, VDE, SABS,
IEMMEQU, and other certifications.
Note: Electrical connections must be carried out by professionals. When
connecting the equipment to the main power of the building, professionals should
use proper power circuit breaker that is up to local electrical specifications.
Circuit Breaker
The customer is responsible for providing circuit breaker. The circuit breaker
should be easy to operate and connect to equipment and is up to CCC, CE, and
other certifications.
Thermal magnetic circuit breaker with large inductive load features (D-type trip
feature) is recommended In the case of using fuse, time lag dual-resistance fuses
are recommended. Compliance with these recommendations can avoid tripping.
Summary of Contents for Exceed 22 Series
Page 54: ...MTS Exceed 22 Series Product Information 54 Shortcut Operations Operation...
Page 58: ...MTS Exceed 22 Series Product Information 58 Troubleshooting...
Page 60: ...MTS Exceed 22 Series Product Information 60 Equipment Disassembly...
Page 67: ......
Page 68: ...m MTS Systems Corporation http www mts com en Global index asp ISO 9001 Certified QMS...