3.4 Connecting power to the NS50
A pre-deployment power-up test of NS50 units is recommended. To conduct a power-up test:
1.
Connect the composite fibre/power cable to a DC power source with correct termination. Note that
the DC supply must be between 10 and 50VDC.
NS50 User Guide
31
Revision C
Installation
Summary of Contents for Impact NS5001
Page 1: ...NS50 Wireless Network Switch User Guide Revision C NS50_UG_EN_C ...
Page 2: ......
Page 6: ...Revision C 6 NS50 User Guide ...
Page 8: ......
Page 10: ......
Page 12: ......
Page 24: ......
Page 42: ......
Page 48: ......
Page 98: ......
Page 100: ...Revision C 100 NS50 User Guide Device Discovery ...
Page 104: ......
Page 108: ......
Page 112: ......
Page 116: ......
Page 118: ......