Operation
4.1.
Commissioning
The analyser leaves the factory assembled and ready for use.
►
Check the analyser regarding completeness and integrity.
►
Connect the analyser to the mains.
The analyser switches on.
The operating system boots.
Blue LEDs for ON and power supply are switched on.
(In the event of an error, the Power LED lights red)
The device runs through a start routine of 60 minutes.
The start routine includes:
•
self-test
•
warm-up of the NDIR bench
•
cool down of the double stage gas cooler, indicated by the sym-
bol
•
Zeroing, indicated by symbol.
The remaining time until the end of zeroing is
displayed.
•
Ready for operation after 60min
4.2.
Operating panel
All functions are controlled via the touch surface of the instrument.
Different gestures are available in the individual menus and windows.