Bolt™ Jr+ Quick Start Guide
27
Starting up the Bolt™ Jr+ on Track system
Once you have attached all the cables, you power up the rig by switching
on the components in the order described below.
1.
Make sure you have secured the area around Bolt Jr+.
Put up guard rails around Bolt Jr+ (and the track) as
necessary, and tell others on the set that you are now
powering up the rig.
2.
Release the E-stop on the
Bolt Jr+ Base
by turning the
red button clockwise until the button pops up.
Do not
release the other E-stop by the computer stack yet.
3.
Power up Bolt Jr+ itself as follows:
For more details on the LEDs during power up on CR800 controller
that is housed inside the base, refer to page 24.
4.
Power up the Flair computer system and all of its components,
including the RT-14 interface box. You can do this while the robot is
powering up (step 2).
Do not start the Flair application yet
.
5.
On the Flair PC, start the Flair application by double-clicking on the
Flair icon on the Desktop.
Flair automatically loads the relevant firmware into all attached axis
boards, including:
The Quad Board that runs the track motor
The Ulti-box that is mounted on the Bolt Jr+ arm
Any additional interface boxes that are attached to the
computer stack and any model movers
Turn on the power switch on
the side of the Bolt Jr+ Base.
Summary of Contents for CINEBOT Bolt Jr+
Page 4: ...Bolt Jr Quick Start Guide iv Power Requirements 45...
Page 17: ...Bolt Jr Quick Start Guide 13 Notes...
Page 36: ...Bolt Jr Quick Start Guide 32 Notes...
Page 37: ...Bolt Jr Quick Start Guide 33 Notes...
Page 45: ...Bolt Jr Quick Start Guide 41 Notes...
Page 46: ...Bolt Jr Quick Start Guide 42 Notes...