MRC SPC-60 Operating Instruction Download Page 1

6/

8inch spin coater

s

SPC-6

0

/8

0

 Operating instruction

PLEASE READ THIS MANUAL CAREFULLY BEFORE OPERATION 

Hagavish st. Israel 58817  Tel: 972 3 5595252, Fax: 972 3 5594529   

[email protected]

 ,3

MRC.

8

 

.22

Summary of Contents for SPC-60

Page 1: ...6 8inch spin coaters SPC 60 80 Operating instruction PLEASE READ THIS MANUAL CAREFULLY BEFORE OPERATION Hagavish st Israel 58817 Tel 972 3 5595252 Fax 972 3 5594529 mrc mrclab com 3 MRC 8 22 ...

Page 2: ...onnection 4 4 1 Installation location 4 4 2 Vacuum unit 4 4 3 Circuit installation 4 4 4 Loading substrate 5 4 5 Substrate alignment 5 5 Experiment operation 6 5 1 Whole process 6 5 2 Operation interface 6 6 Matters needing attention 8 6 1 Equipment cleaning 8 6 2 Tray replacement 8 ...

Page 3: ...ials research The working chamber of the spin coater is made of PMMA which has the advantages of beautiful light and easy to observe Product features 1 It can be used for coating organic compounds with uniform glue for film preparation 2 It can store the process parameters of different substrates Each coating process can be set with different rotation speed 3 The working chamber is made of plexigl...

Page 4: ...tion time resolution 1 S Maximum acceleration 8 000RPM S Size 290mm W x360mm D x370mm H Weight 20kg Power input 200 230V single phase 600W Vacuum input requirements 0 06 0 09Mpa vacuum flow minimum 15L min or more Vacuum interface φ6 8mm quick screw interface Working gas Non corrosive gases such as nitrogen argon oxygen etc ...

Page 5: ...ver 2 Loading tray 3 Chamber bottom cover 4 Touch screen 5 Power switch 6 USB interface 7 Vacuum interface 8 Vacuum pump communication port 9 Power cord The structure of the tray is shown in the figure a Central exhaust b O ring c Vacuum adsorption tank d Loading tray ...

Page 6: ...ter of 8mm hose The installation of quick screw joint is shown in the following figure 1 Remove the nut and pass the hose through the nut 2 Put the hose into the joint in front of the thread paying attention to the need to completely cover the joint with the hose 3 Tighten the thread the nut can compress the hose after tightening and play a sealing role 4 3 Circuit installation First connect the p...

Page 7: ...f the equipment thereby blocking or corroding the internal pipeline of the equipment 4 5 Substrate alignment Align the center of the substrate with the center of the tray You can turn on the vacuum pump to adsorb the substrate on the tray plate try to manually flip the tray plate and observe whether the sample rotates eccentrically If there is eccentricity it should be adjusted again until the sub...

Page 8: ...vacuum adsorption is firm during operation and observe whether the sample can be accurately aligned 5 After the trial run wait for the running to stop and then set the coating program as required 6 Drop the experimental liquid into the center of the sample and close the lid 7 Click Start on the touch screen and wait until the coating is finished 8 After the loading tray completely stops rotating t...

Page 9: ...stop of the equipment and the setting can enter the setting interface The pump switch can control the start and stop of the vacuum pump Setting interface The setting interface is shown in the figure which can store A E five spin coating formulations Each formula can be set with five stages of operation The rotation speed acceleration and duration of each section can be directly set by clicking the...

Page 10: ...nt damage to the contact surface between the substrate and the tray plate Notice It is strictly forbidden to use spray cleaning solvent or directly use solvent to clean the tray plate still installed on the shaft which may cause damage to the vacuum pump or the spin coater 6 2 Tray replacement Various sizes of trays are designed to provide a flat hard surface suitable for processing substrates of ...

Reviews: