15
6. Operation
CAUTION:
Do a complete process of
aspirating and dispensing before the first time
work.
6.1.
Power on
Step - 1:
Power on and waiting system self-checking
complete.
Step - 2:
Long press
Pre-filling button
(
),2
seconds to let air out, leaving the piston at the bottom of
the barrel finally.
6.2.
Dispensing
Step - 1:
Press and hold
Setting button
(
)about
2s to active the parameter setting.
Step - 2:
Press Setting button(
)to N value, set it
to 1. The
filling speed U
and
dispensing speed D
can be
set by user intention, the range is 1 to 16.
Press and hold
Setting button
(
)or not to do
any operation about 2s, will quit from the parameter
Summary of Contents for BDI-DIG
Page 16: ...13...
Page 22: ...19 had been emptying Step 3 Turn Return Valve to direction Emptying operation was completed...
Page 25: ...22...
Page 28: ...25 Step 3 Follow the figure to assemble the adapter and remote Dispensing pipe...
Page 32: ...29 Disassemble Dispensing valve Disassemble Filling valve...
Page 33: ...30...