6 Commissioning the on-load tap-changer at the transformer manufacturer's site
Maschinenfabrik Reinhausen GmbH 2015
165
4427410/00 EN
OILTAP® R
2.
Connect the grounding screw of the motor-drive protective housing to
the transformer tank.
Figure 214: Grounding screw on motor-drive unit
3.
When using a temperature sensor, ground the temperature sensor
housing on the on-load tap-changer using the grounding cable.
Performing tests on motor-drive unit
Function tests
► Perform function checks as described in relevant MR operating instruc-
tions "TAPMOTION® ED".
Dielectric tests on transformer wiring
► Note information relating to dielectric tests on transformer wiring in the
associated MR operating instructions "TAPMOTION® ED".
Performing trial tap-change operations
Before energizing the transformer, test tap change operations must be car-
ried out to check the mechanical functions of on-load tap-changer and mo-
tor-drive unit.
NOTICE
Damage to the on-load tap-changer!
Damage to the on-load tap-changer by actuating the on-load tap-changer
without oil!
► Before actuating the on-load tap-changer for the first time, the tap se-
lector must be completely immersed in transformer oil and the oil com-
partment completely filled with oil.
► The on-load tap-changer can be operated in the temperature range of
the surrounding transformer oil of between -25 ° and +105 °C and with
overload up to +115 °C in accordance with IEC 60214-1.