8 Control system protocol
Maschinenfabrik Reinhausen GmbH 2021
102
8209941/00 EN
ECOTAP
®
VPD
®
III 30D-24 / MD&C
3)
With the command "Multiple switching operations" up to 3 successive
switching operations can be executed without a regular pause of 3 seconds.
This is followed by a cooling period of
▪ 3 seconds for 1 on-load tap-change operation
▪ 6 seconds for 2 on-load tap-change operations
▪ 9 seconds for 3 on-load tap-change operations.
Summary of Contents for ECOTAP VPD 3 30D-24
Page 131: ......