background image

Aufbau- und Montageanleitung • 

• 

• 

• 

• Assemb

Assemb

Assemb

Assemb

Assembllllly and Mounting Instr

y and Mounting Instr

y and Mounting Instr

y and Mounting Instr

y and Mounting Instructions

uctions

uctions

uctions

uctions

   „Nixie Cloc

   „Nixie Cloc

   „Nixie Cloc

   „Nixie Cloc

   „Nixie Clock Sv

k Sv

k Sv

k Sv

k Sven! R

en! R

en! R

en! R

en! Reeeeevvvvv..... 2-1“

 2-1“

 2-1“

 2-1“

 2-1“   a

   a

   a

   a

   ab Serien-Nr

b Serien-Nr

b Serien-Nr

b Serien-Nr

b Serien-Nr..... • fr

 • fr

 • fr

 • fr

 • from Serial-No

om Serial-No

om Serial-No

om Serial-No

om Serial-No..... SV410  (Main-PCB R

 SV410  (Main-PCB R

 SV410  (Main-PCB R

 SV410  (Main-PCB R

 SV410  (Main-PCB Re

ee

eevvvvv.05-12)

.05-12)

.05-12)

.05-12)

.05-12)

– 1 / 8 –

Herzlichen Glückwunsch zum Erwerb Ihres neuen Nixie-Uhren-Bausatzes „Sven“.
Für einen erfolgreichen Zusammenbau ist die Beachtung einiger Grundregeln erforderlich.

• Dieser Bausatz richtet sich an den fortgeschrittenen Bastler. Erfahrungen in der Elektronik
sind hierbei unerlässlich.
• Wenn Sie merken, dass der Bausatz für Sie zu kompliziert ist, versuchen Sie bitte nicht, ihn
„zusammenzuschustern“. Dies endet in der Regel in einem nicht mehr reparablen Gerät. Bitte
wenden Sie sich so früh wie möglich an den Anbieter, der Ihnen Hilfestellung geben kann.
• Bitte nehmen Sie mindestens 2-3 Stunden Zeit. Einen Bausatz in Hektik zusammenzulöten,
erzeugt letztendlich nur Frust – und die Fehlersuche dauert hinterher „ewig“.
• Ihr Arbeitsplatz sollte sauber, aufgeräumt und gut ausgeleuchtet sein.
• Entsprechendes Elektronikerwerkzeug wie Schraubendrehersatz, Seidenschneider, Spitz-
zange und Pinzette sollte sich in Griffnähe befinden.
• Nur eine temperaturgeregelte Elektronik-Lötstation mit max. 1 mm runder Spitze samt ent-
sprechendem dünnem Lötzinn verwenden. Falls Sie bleifreies Lötzinn verwenden wollen: Sehr
gute Erfahrung wurde mit Lötzinn Iso-Core EL Sn95,5 Ag3,8 Cu0,7 mit 0,5 mm Ø und 3,5%
Flussmittel von Felder Löttechnik und 400°C Löttemperatur gemacht.
• Für den Funktionstest benötigen Sie ein Multimeter mit einem Messbereich von 200 V.
• Eine Lupe für das Lesen der Bauteilebedruckungen ist ganz hilfreich.
• Bitte halten Sie sich beim Bestücken an die in dieser Anleitung vorgegebene Reihenfolge.
Diese ist erprobt und vermindert auch das Fehlerrisiko.
• Es wird davon ausgegangen, dass Ihnen bekannt ist, dass Halbleiter (Dioden, IC’s, Transis-
toren) oder Elkos gepolte Bauelemente sind, eine entsprechende Markierung besitzen und
deshalb auch in der korrekten Richtung bestückt werden müssen.

Zusammen mit dieser Bauanleitung erhalten Sie weitere Dokumente als Download:

• Das komplette Schaltbild des Nixie-Uhren-Bausatzes in Farbe.
• Die vollständige Stückliste und das Layout.
• Eine zweisprachige Bedienungsanleitung für Ihre neue Nixie-Uhr.

Wichtige Sicherheitshinweise:

Beim Aufbau, der Inbetriebnahme sowie bei Messungen und Reparaturen ist besondere Vor-
sicht geboten! Die im Thermometer erzeugte Hochspannung von ca. 180 V ist gefährlich. Der
Aufbau der Schaltung geschieht auf eigene Gefahr. Die Funktionstüchtigkeit kann nicht garan-
tiert werden, ebenso wenig die Eignung für bestimmte Einsatzzwecke. Der Anwender hat diese
Eignung selbst zu überprüfen und zu verantworten. Für Schäden, die während oder als Folge
des Aufbaus oder Betriebs entstehen, kann keine Haftung übernommen werden, insbesondere
für Schäden, die aus mangelnder Fachkenntnis heraus entstehen. Die Nixie-Uhr darf nur in
einem berührungssicheren Gehäuse in trockenen Innenräumen betrieben werden. Derjeni-
ge, der einen Bausatz fertig gestellt oder eine Baugruppe durch Erweiterung bzw. Gehäuseein-
bau betriebsbereit gemacht hat, gilt nach VDE 0869 als Hersteller und ist verpflichtet, bei der
Weitergabe des Geräts alle Begleitpapiere mitzuliefern und auch seinen Namen nebst An-
schrift anzugeben. Geräte, die aus Bausätzen selbst zusammengestellt werden, sind
sicherheitstechnisch wie ein industrielles Produkt zu betrachten.

Und nun, meine Dame, mein Herr – befeuern Sie Ihre Lötstation und blättern Sie um...

Congratulations for purchasing this Nixie clock kit „Sven“.
For successful assembly of this kit please read the following helpful hints.

• This kit is designed for someone who has advanced experience with assembling electronics.
• If you believe that the kit is too complicated for your skill level please do not try to assemble it
- this generally ends up with a device that is not repairable and results in you being very
frustrated. Please contact the provider and they can offer you other options that will end in a
more fulfilling result!
• Take your time - this kit should take 2-3 hours to complete if uninterrupted.  Assembling the kit
in a hurry will lead to frustration and troubleshooting takes three times as long.
• Ensure your work area is well lit (daylight preferred) and clean.
• Electronic tools, such as pliers, small side-cutters or tweezers will be handy. You will also
need a T8 (Torx) or SW2 Allen screwdriver for the housing assembly.
• A soldering iron station with a 1 mm round tip (maximum) and a 0.8 mm (maximum) fine
electronic solder is required. For lead-free solder we’ve had good experience with type Iso-
Core EL Sn95,5 Ag3,8 Cu0,7 with 0,5 mm Ø and 3,5% Flux from Felder Löttechnik and a 400°C
soldering tip temperature.
• For the intermediary function test you need a multimeter with at least 200 VDC range.
• A loupe (magnifying glass) to read the small device markings is often helpful.
• Assemble the board in the order as stated in the instructions - this has been proven and will
minimise mistakes.
• It is assumed that you understand that semiconductors (diodes, ICs, transistors) or electrolytic
capacitors are polarized components. Appropriate markings are silk-screened on the PCB and
shown on the board schematic.

Together with this construction guide there are some documents you should download

• The full colour schematic of the Nixie clock kit.
• A complete part list and the layout of the PCB.
• A bilingual operation manual for your new Nixie clock kit.

Safety precautions:

During assembly, operation, measurements and maintenance extra precautions must be taken.
The generated high voltage of 180V is dangerous. Assemble the circuit at your own risk.
The clock’s functionality cannot be guaranteed when assembled by the customer.
No responsibility can be taken for any personal claims and damages during assembly and
commission, especially for damages based on insufficient technical knowledge.

The Nixie clock may only be operated in a solid and moisture-proof enclosure.

The person who completes the kit and assembles this board into an enclosure for operation is
considered by the German directive VDE 0869 as a manufacturer and is required to indicate
their name and address including all documents when selling the clock.
Ready-to-go devices, which are assembled from kits, are counted as a safety-related industrial
made product.

Okay, and now, Ladies and Gentlemen – start your soldering irons and flip the page...

Summary of Contents for SV410

Page 1: ...darf nur in einem ber hrungssicheren Geh use in trockenen Innenr umen betrieben werden Derjeni ge der einen Bausatz fertig gestellt oder eine Baugruppe durch Erweiterung bzw Geh useein bau betriebsber...

Page 2: ...his fault and fix them later Bedauerlicherweise mussten wir bei einigen Leiter platten einen tzfehler feststellen Dieser tzfehler f hrt dazu dass die Uhr berhaupt nicht funk tioniert lediglich die RGB...

Page 3: ...r dicht beieinander liegen In gleicher Weise best cken Sie im Folgenden die neun St ck MPSA42 Transistoren T1 T9 Zum Abschluss dieser ersten gr eren Arbeiten auf dem Motherboard best cken Sie noch die...

Page 4: ...n das L tauge GND welches sich direkt oben rechts neben der Spule befindet Messen Sie die Spannung an der Kathode von D9 Messwert ca 5 8 V Messen Sie die Spannung der Kathode von D4 Messwert ca 10 5 V...

Page 5: ...ie Kondensatoren entladen haben Nun l ten wir den Temperaturf hler IC9 von der L tseite aus ein Beachten Sie unbedingt den Abstand von ca 7 mm zur Leiterplatte damit letztendlich der F hler auch aus d...

Page 6: ...lock Sv k Sv k Sv k Sv k Sven R en R en R en R en Re e e e ev v v v v 2 1 2 1 2 1 2 1 2 1 a a a a ab Serien Nr b Serien Nr b Serien Nr b Serien Nr b Serien Nr fr fr fr fr from Serial No om Serial No o...

Page 7: ...spacer please remove them as it is not used 2 As these tubes are bigger in size four additional 10 mm spacers must be screwed into the existing four 40 mm spacers of the tube mounting tool 3 The IN 1...

Page 8: ...wie der externe Anschluss des Temperatur sensors oder ein Alarmausgang via Optokoppler Diese Funktionen sind den technisch Versierten vorbehalten die in der Lage sind das Schaltbild zu lesen zu verst...

Page 9: ...sind Testpins f r den Leiterplattenhersteller zum berpr fen der RGB LEDs Falls Sie bei diesen LEDs einen Fehler vermuten k nnen Sie diese Testpins verwenden Ziehen Sie zumindest den 12F629 RGB PIC aus...

Page 10: ...AL A6 Sx1 26 LED ALARM 27 LED DCF 28 BL2 3 BL2 3 T5 MPSA42 T5 MPSA42 R45 R45 T24 FQT4N20L T24 FQT4N20L D5 4148 D5 4148 R24 7k5 R24 7k5 BL2 4 BL2 4 BL1 2 BL1 2 B B C22 1u C22 1u S3 ALARM S3 ALARM UB U...

Page 11: ...n tube board 2 Buchsenleiste Female Connect BL1 BL2 auf dem Mainboard on main board 2 17 mm Drucktaster Switch S1 S4 4 DC Buchse Jack 5 5 2 1 mm BU1 1 3 5 mm Buchse 1 8 TRS Jack BU2 1 0 4 A Polyfuse S...

Reviews: