Page 1: ......
Page 2: ...g components should be aligned and spaced at least 1 16 apart Pump rotation must be clockwise when facing shaft Check direction of rotation before startup Maximum speed is 1750 rpm Water Flush of Pack...
Page 3: ...tion Mechanical Seal Leakage Mechanical Seal Models Only 1 Leakage at startup If leakage is slight allow pump to run several hours to let faces run in 2 Persistent seal leakage Faces may be cracked fr...
Page 4: ...assembly lightly tap the shaft at the flexible joint connection end using a block of wood to protect the shaft The bearings may be pressed off the shaft PUMP ASSEMBLY 1 Press radial bearing 29 and thr...
Page 5: ...from turning and rotate the stator counterclockwise while pushing towards suction housing Care should be taken to insure that flexible joint does not bend more than 15 degrees 9 Secure top and bottom...
Page 6: ...ng Gland 320 0003 004 42 Packing 340 3396 008 46 Rotor Pin Shaft Pin 3 req 320 4486 003 47 Gland Bolt 2 req 619 1530 241 57 Lantern Ring Half 2 req 320 6585 000 66 Snap Ring 320 2794 000 69 Mechanical...
Page 7: ...000 EPDM Kit No 320 6506 000 NBR Nitrile EPDM Ethylene Propylene Diene Terpolymer REPAIR CONVERSION KIT NUMBERS PACKING GLAND Item No Description All Packing Gland Models Kit No 311 9049 000 3 Packin...