6880309U09-A
October 26, 2007
Radio Alignment and Programming Procedures
: Alignment
5-3
Because of the bridge audio amplifier circuit used in the radio, it is necessary to construct and use a
simple audio load test adapter as shown in the schematic diagram above, when conducting receiver
alignment steps.
Figure 5-1. AF Test Adapter Schematics
5.4
Alignment
5.4.1
PLL & Transmitter
• Set up the test equipment as shown on
for transmitter alignment.
• Maintain the supply voltage at 13.4 V DC for all steps.
5.4.2
PLL VCV
1. Connect the positive lead of the DC voltmeter to the test point TP1010 (VCV) on the Main
Unit, and the negative lead to chassis ground.
2. Set the transceiver to the high band edge frequency channel, then adjust trimmer-capacitor
T1005 on the Unit for 7.0 V on the voltmeter.
3. Key the transmitter, and adjust trimmer-capacitor T1006 on the Unit for 7.0 V on the
voltmeter.
4. Next select to the low edge frequency channel and confirm about 1.8 V (1.5 V to 2.1 V) on the
voltmeter.
5. Key the transmitter, and confirm about 1.8 V (1.5 V to 2.1 V) on the voltmeter.
Table 5-1. Alignment Channel Frequencies
Channel
Frequency (MHz)
(Simplex)
CTCSS
Encode
DCS
Encode
CH1
29.71/ 37.01
None
None
CH2
33.35/ 43.01
None
None
CH3
36.99/ 49.99
None
None
CH4
33.35/ 43.01
151.4 Hz
None
CH5
33.35/ 43.01
None
023
To 20-pin
accesories
connector
2Ω
10W
GND
Attenuated
Test Output
To the input of the
audio analyzer
2Ω
10W
(4Ω Dummy Load)
Summary of Contents for PM1200
Page 1: ......
Page 2: ......
Page 6: ...iv Notes ...
Page 30: ...October 26 2007 6880309U09 A 2 4 Basic Maintenance Handling Precautions Notes ...
Page 38: ...October 26 2007 6880309U09 A Notes 3 8 Basic Theory of Operation PLL Synthesizer ...
Page 108: ...October 26 2007 6880309U09 A Notes 7 4 Basic Troubleshooting Receiver Troubleshooting ...
Page 134: ...October 26 2007 6880309U09 A Glossary 8 Notes ...
Page 137: ......