xviii
Summary of Changes
The following is a list of changes made since the last release of this
manual.
Overview of Contents
This section provides a brief overview of each chapter and appendix within
this document.
Chapter 1, Hardware Preparation and Installation
, provides a brief
product description and a block diagram. The remainder of the chapter
provides information on hardware preparation and installation
instructions, including peripheral boards such as the TMCPN710 or TM-
PIMC-0001 Transition Module.
Chapter 2, Startup and Operation
, provides an overview of basic operating
and configuring issues such as the PPCBug firmware, the memory maps,
interrupts, arbitration, sources of reset and endian issues.
, provides an overview and description of basic
PPCBug use including implementation issues, a list of the initialization
sequence, a description of basic debugger commands, as well as a list of
diagnostic tests typically run.
Date
Changes
Replaces
09/01
Updated table of model numbers
preceeding this section.
Reinserted information left out of IH4
version of manual, which included
information on MCPN750A, the
TMCPN710 and the TM-PIMC-0001,
instead of the earlier MCPN750. Also,
included J8 jumper settings for Stand-
Alone operation.
Previously listed model numbers.
07/00
68-pin .08 Series Subminature D PMC I/O
Connector.
68-pin .050 Series Subminature
D PMC I/O Connector.
Summary of Contents for MCPN750A
Page 13: ...xii ...
Page 15: ...xiv ...
Page 53: ...1 32 Computer Group Literature Center Web Site Hardware Preparation and Installation 1 ...
Page 67: ...2 14 Computer Group Literature Center Web Site Startup and Operation 2 ...
Page 105: ...5 14 Computer Group Literature Center Web Site Remote Start Via the PCI Bus 5 ...
Page 167: ...7 38 Computer Group Literature Center Web Site Connector Pin Assignments 7 ...
Page 171: ...A 4 Computer Group Literature Center Web Site Specifications A ...
Page 187: ...Index IN 10 Computer Group Literature Center Web Site I N D E X ...