Chapter 3 Pre-Installation
Gen 3 Site Controller System Manual
Receipt of Equipment
3-2
68P80801E30-A 5/1/2002
Receipt of Equipment
Equipment Inspection
Inspection of the site control equipment must be performed as soon as all
equipment is unpacked.
Note:
If obvious damage has occurred to shipping containers before
unpacking, contact the shipping agent. Ask that a representative of
the shipping company be present while the equipment is unpacked.
Observe guidelines for safe handling of electro-static sensitive devices or
equipment to prevent electrostatic discharge damage. A conductive wrist
strap is provided with the site controller and should always be worn when
handling any electrical component. Connect the wrist strap to the grounding
clip on the Cabinet.
Inspect the following upon receipt of the site controller:
■
check for loose or damaged equipment
■
check all sides of each cabinet for dents, scratches, or other damage
■
check all cabinet wiring to insure connections are in place
■
check modules and boards for physical damage to controls or connectors
■
verify that ground straps are secure
If any equipment is damaged, contact the shipping company immediately,
and then your Motorola representative.
Equipment Inventory
Check the site control equipment against the itemized packing list to insure
receipt of all equipment. If available, check the sales order with the packing
list to account for all equipment ordered. Contact your Motorola
representative to report missing items and for additional information.