Chapter 5 Final Checkout
Gen 3 Site Controller System Manual
Final Checkout Setup
5-2
68P80801E30-A 5/1/2002
Final Checkout Setup
The following procedures should be performed after installation of the site
controller is complete. This Final Checkout procedure ensures the proper
operation of the site controller.
1.
On the Cabinet, set all circuit breakers to OFF.
Figure 5-1 shows the Cabinet Breaker Panel.
For details of the AC/DC Power System for the SRSC, refer to the SRSC
GEN 4 EBTS section of the
EBTS System Manual. (on CD: 98P80800A17)
RFS3
CTRL A
RFS2
EAS/IMU CTRL B
7.5A
OFF
ON
iSC076
060796JNM
7.5A
3A
25A
25A
7.5A
3A
3A
25A
25A
BR1
BR3
RFS1
BR2
BR4
OFF
ON
OFF
OFF
ON
OFF
OFF
ON
OFF
OFF
ON
OFF
OFF
ON
OFF
OFF
ON
OFF
OFF
ON
OFF
OFF
ON
OFF
OFF
ON
OFF
OFF
ON
OFF
Figure 5-1
Cabinet Breaker Panel for standard site
controller rack or SRRC (front view)