
Accessories
126
4.
Service Port
Powering the Cradle
The cradle is configured with default values to run correctly out-of-the box. Once the cradle is con-
nected to the network, all you need to do is turn on the power by connecting the power cord of power
supply unit to an AC power outlet. The AC power outlet should be near as possible to the equipment
and should be accessible.
Note: When the power supply unit of the cradle is connected to power, all LEDs are turned on for 2
seconds and then turned off to indicated self test mode.
DC
Cable
AC
Cable
FIGURE 52.
Charging/Communication cradles - Cradle Basic Connections
Mounting screw
Service Port
AC
Cable
LAN
Port
Power
Inlet
Summary of Contents for F4707A
Page 1: ...HC700 G HCe700 G Handheld Computers Models F4708A HC700 G F4707A HCe700 G User Manual a ...
Page 2: ......
Page 26: ...3 What is the HC700 G Handheld Computer ...
Page 28: ...5 Unpacking ...
Page 29: ...Welcome 6 ...
Page 30: ...7 CHAPTER 2 HC700 G Features ...
Page 34: ...11 Rear and Bottom Side Features ...
Page 35: ...HC700 G Features 12 ...
Page 46: ...23 Windows Mobile Basics Speaker off Bluetooth on Wi Fi on Wi Fi data call ...
Page 47: ...Starting to Work 24 ...
Page 103: ...Using the Phone 80 ...
Page 121: ...Wireless LAN Connection 98 ...
Page 188: ...165 4 Administering the Cradle Using SNMP FIGURE 80 MIBII information ...
Page 223: ...Administering the 4 and 8 Bay Charging Communication Cradles 200 ...