![Motorola solutions L5Q Installation Manual Download Page 14](http://html1.mh-extra.com/html/motorola-solutions/l5q/l5q_installation-manual_1839178014.webp)
Figure 9: Connecting the Battery Terminal
4
Replace and tighten the bolt on the rear of the solar panel.
2.6
Setting the Camera Date and Time
NOTICE:
For firmware version 0224a and application version 1.1.0, the camera date and time
can also be set remotely from the Reconyx Connect application.
Procedure:
1
Perform one of the following actions:
• Open the camera and install 12 AA Lithium Ion Batteries.
• Connect the camera to the Solar Panel with the power cable.
NOTICE:
If you are connecting the camera to the Solar Panel, do not install the 12 AA
batteries. Place the included desiccant pack into the battery compartment to protect it
from moisture.
2
To power on the camera, slide up the power switch to the right of the LED display.
3
Press the
Right
button to scroll through the menu options to
CHANGE SETUP
.
4
Press
OK
.
5
Press the
Right
button to scroll to
DATE/TIME
.
6
Press
OK
.
7
Press
Up
or
Down
button to change numbers and
Right
or
Left
button to scroll through settings
for year, month, date, and time accordingly.
8
Press
OK
to exit.
9
Power off the camera.
10
Remove power cable from camera if plugged in.
2.6.1
Setting the Camera Date and Time from Reconyx Connect
Prerequisites:
This procedure is only working with a firmware version 0224a or later and application
version 1.1.0 or later.
MN007598A01-AD
Chapter 2 : Getting Started
14