Installation
13
Manual # 42-02-U001, Rev C1
1. Check that factory wiring listed in the Connections On columns in the following table
matches the voltages specific to your installation. If they do not match, move the con-
nections to those specified for your voltage.
2. Connect the jumper wires (included in shipment) to transformers T1 and T2 according
to the Jumpers column in the following table. Verify that the factory default line settings
match your line voltage as indicated in the Connections column. Change if necessary.
Note
Jumpers used to configure the transformers are provided. They are in a plastic bag, usually
taped to a transformer in the main TAPS enclosure.
Table 5. Transformer Jumper Schedule, 3 kVA TAPS Units
Line
Voltage
Transformer T1
Transformer T2
Connections
Jumpers
Connections
Jumpers
208 VAC
H1, H6
H1 to H5
H2 to H6
H1, H6
H1 to H5
H2 to H6
220 VAC
H1, H7
H1 to H5
H3 to H7
H1, H7
H1 to H5
H3 to H7
240 VAC
H1, H8*
H1 to H5
H4 to H8
H1, H8*
H1 to H5
H4 to H8
416 VAC
H1, H6
H2 to H5
H1, H6
H2 to H5
440 VAC
H1, H7
H3 to H5
H1, H7
H3 to H5
480 VAC
H1, H8*
H4 to H5
H1, H8*
H4 to H5
* = Factory Default Setting
Summary of Contents for TAPS
Page 6: ...2 Manual 42 02 D001 Rev A 1 September 2003...
Page 15: ...Installation 9 Manual 42 02 U001 Rev C1 Figure 5 6kVA UPS Enclosure Base Assembly...
Page 16: ...10 Manual 42 02 U001 Rev C1 Figure 6 6kVA UPS Enclosure Assembly...
Page 40: ...34 Manual 42 02 U001 Rev C1 6kVA Units The 6kVA unit uses an LCD as well as LEDs...
Page 42: ...36 Manual 42 02 U001 Rev C1 6 12 12...
Page 43: ...TAPS Drawings 37 Manual 42 02 U001 Rev C1...
Page 44: ...38 Manual 42 02 U001 Rev C1...