Moser Baer Max CAAP Installation And User Manual Download Page 5

3

1 WARNING NOTICE

1.1 General Safety

1.2 Handling Safety

 Hazardous electricity ! Can shock burn or cause death.

1.

Photovoltaic modules can generate electricity upon exposure to light. The voltage 
of a single module is less than 45VDC, but the shock hazard increases as modules 
are connected in parallel producing higher current. The shock hazard increases 
as modules are connected in series producing higher voltages.

2.

All instructions should be read and understood before attempting to install, wire, 
operate, and maintain the photovoltaic module. Contact with electrically active 
parts of the module     such as terminals can result in burns, sparks, and lethal 
shock whether the module is connected or disconnected. 

3.

Do not disconnect the connector of the modules while under load. To achieve 
disconnect while under load, a provision of High Voltage Slow Blow DC Fuse or 
High Voltage DC MCB should be provided in the Array Junction Box.

1.

To avoid the hazard of electric shock and injury, cover the entire front surface of the 
PV modules with a dense, opaque material such as a cardboard sheet, during 
installation and handling of the modules.

2.

Do not hit or put excessive loads on the glass or back sheet or twist the frame, the 
glass may break, PV cells may break.

3.

Do not stand or step on the PV module, the glass may be slippery and there is a 
risk of injury or electric shock if glass breaks.

4.

PV modules are heavy , please handle with care. Do not drop or allow objects to fall 
on the PV module.

5.

Do not twist the interconnect cable excessively

6.

Unauthorized  persons-except  the  qualified  licensed  professional--should  not 
open the cover of the junction box to avoid the hazard of electric shock. Provide 
suitable guards to prevent yourself from direct contact with 30 VDC or greater to 

Summary of Contents for Max CAAP

Page 1: ...Re energizing the World Installation and User Manual Moser Baer Photo Voltaic Modules Crystalline Silicon Modules Max Value Series...

Page 2: ...ionals Moser Baer is a world leader in development and high volume manufacturing of technology products Our prime commitment is to produce quality products that last for many years Moser Baer PV modul...

Page 3: ...Installation and User Manual Moser Baer Photo Voltaic Modules Crystalline Silicon Modules Max Series CAAP Value Series AHFP BAAP BCAP BDAP BGFP 1...

Page 4: ...e Specifications 6 Product identification 7 Disclaimer of Liability 3 1 1 General safety 3 1 2 Handling safety 3 1 3 Installation safety 4 5 2 1 Site Selection 5 2 2 Tilt Angle Selection 5 2 3 Mountin...

Page 5: ...connect while under load a provision of High Voltage Slow Blow DC Fuse or High Voltage DC MCB should be provided in the Array Junction Box 1 To avoid the hazard of electric shock and injury cover the...

Page 6: ...he system 4 Avoid uneven shade on the PV module surface Shaded cells may become hot hot spot phenomenon which may result in permanent damage to the module 5 Do not drill holes in the frame it may comp...

Page 7: ...winter months when the arc of the sun is lowest over the horizon 4 Solar modules produce maximum power when they are pointed directly at the sun 5 For installations where the solar modules are mounted...

Page 8: ...allation 1 Place the modules on top of the structure mount it by using the pre drilled elliptical mounting holes as shown below fix it firmly on the structure using the mounting hardware s M4 nuts Bol...

Page 9: ...7...

Page 10: ...stainless steel so as to eliminate the possibility of rust 6 The Open circuit Voltage exceeds the rated voltage Take care that the open circuit voltage multiplied by the number of modules in series i...

Page 11: ...surface to allow cooling air to circulate around the back of the module This also allows any condensation or moisture to dissipate 1 Roof mounted PV modules should be mounted on a fire resistant roof...

Page 12: ...e surface air from circulating under the module Leave atleast 4 inches of clearance between the roof the module frame 7 Module need to be securely mounted on fire resistant roof slope less than 5 in f...

Page 13: ...design such a system Permits are normally required to install such a system and the utility must formally inspect and approve such a system before it is connected to the grid The module frame must be...

Page 14: ...ng is used i e grounding plus of minus such grounding means should be isolated from live parts by reinforced insulation Option 1 The grounding will be provided by fixing earthing cable with Hex Nut St...

Page 15: ...e fluids salt and against general weathering Resistance to abrasion No Dia 56x0 30mm Dia of conductor 2 56mm Electron beam cross linked polyolefin colour Natural Electron beam cross linked polyolefin...

Page 16: ...applicable codes for outdoor installation of wires in conduits Verify that all fittings are properly installed to protect wire against damage prevent moisture intrusion 10 Number of module in series c...

Page 17: ...8 5 36 5 Current at Pmax Imp A 4 51 4 51 7 12 4 64 4 7 Open circuit voltage Voc V 21 78 29 04 21 5 36 05 43 26 Short Circuit Current Isc A 4 8 4 8 7 6 5 05 5 1 NOCT 2 C 47 47 47 47 47 Maximum System V...

Page 18: ...p 3 MBPV CAAP 25 mm ice ball at 23 m s at 11 impact locations 10 156 x 156 60 10 X 6 1661 X 991 X 40 19 5 2400 50 lbs ft 5400 113 lbs ft Multi Crystalline Cells 47 2 1000 600 0 43 0 344 0 11 IP 65 40...

Page 19: ...isible on the front side of the module 3 The code is typically MB XX X XXX XX XX XXX The date of manufacture of the product can be deciphered from the 6th 7th and 8th digit day of the year and the 9th...

Page 20: ...Re energizing the World Doc No PV CN ENG WI 012 Rev no 01 Rev Date 25 05 2010 Manufactured by...

Reviews: