POWER ON
1) Be sure that the machine is correctly fed by air and electrically..
2) Turn on the machine turning the general switch.
3) Open the valve on the premelter
4) Close the rear inspection panel.
On display you will see:
machine in emergency
machine with cleaner
machine not in temperature
The red light is on
5) Press once the green key,
green is blinking
orange is on
red is blinking
on display :
machine with cleaner
low temperature
6) Exit from the alarms page using the arrow, in case the machine is equipped with the table to
measure thickness, you must press “OK” to set to zero the table.
7) When the temperature icon becomes green, press the green key. The machine sets to zero
the axes.
8) Press the key “glue cleaner” to load the glue.
9) Set the values for the book and the cover you want to realize and press the green button.
The orange light is on, the green one is blinking, the machine will position the axes.
10) Put the cover in the cover feeder, fix the lateral and the rear positioning devices. Close the
safety cover.
11) Put the book in the clamp and press the green button. The machine will produce the book
and it will release it on the plane for collection at the end of the release belt.