39
Installation
XG0199 - 170223
STEP 8:
Place log 2 from LGS59 in front of pilot. Place log 3 from
LGS59 on top of log 2. See figure 26e.
STEP 11:
Completed Installation
STEP 9:
Place log 4 from LGS59 in front of ports just to the right
of log 3 from LGS59. Place log 1 from LGS59 behind ports in the
middle of the tray. See figure 26f.
STEP 12:
Watch for sooting for 30 minutes. If sooting is present,
adjust media and/or logs to eliminate.
STEP 10:
Place log F of LGS58 across log D from LGS58 and log 4
from LGS59, see figure 26g.
2
3
Ports
1
4
Ports
F
Ports
Figure 26.e
Figure 26.h
Figure 26.f
Figure 26.i
Figure 26.g
Summary of Contents for P38
Page 51: ...51 Notes XG0199 170223 ...