16
Installation
XG0199 - 170223
Figure 7.g
Installing a RTO-4F termination.
Installation of termination with built in frame under 8' from the top
of the unit.
A Termination with a built-in frame is installed during framing of a
structure.
1. Frame the termination opening to 17" x 17".
2. Install exterior sheathing to the structure framing.
3. Fasten the termination to the sheathing using a minimum of 4 screws.
RTO-4F (5"/10")
Termination
Framing
Exterior
Sheathing
Fastening Hardware,
minimum 4-screws
”
17
17”
RHS 104
(Not shown)
FOR P52 AND PL52 UNITS ONLY
This section applies to installations where the direct vent termination
will be wall mounted.
NOTE:
If subject to a highly corrosive environment
i.e. seaside, Montigo recommends using stainless steel termination.
Installing a Wall Mounted Termination 5''/10''
RTO-4F (5"/10")
Termination
Framing
Exterior
Sheathing
RHS 104
(Not Shown)
Fastening Hardware,
minimum 4-screws
Summary of Contents for P38
Page 51: ...51 Notes XG0199 170223 ...