5
© 2015 Monte Carlo Fan Company
3/23/2015
12
13
14
15
16
17
Remove every other screws from yoke
located on top of fan assembly. Keep
screws.
Note
: Flush mount is not available with
vaulted ceiling.
Place canopy and rubber pad over lead
wire and safety cable and align the larger
holes in canopy and holes on rubber pad
with the set screws on yoke.
Reinstall the 3 set screws remove in step
12. Tighten screws securely.
To prepare the fan for wiring, hang fan
onto mounting bracket by sliding the
canopy over the mounting bracket hook
(Use one of non-slotted holes on the
rim of the canopy).
For Canadian installation and for USA fan
and light kit combinations over 35 lbs, in
both flush and downrod modes the safety
cable must be installed into the house
structure beams using 1.5” lag screws,
washers and lock washers provided. Make
sure that when the safety cable is fully
extended the lead wires are longer than
the cable and no stress is placed on the
lead wires.
Note
: If Installing The Secondary Support
Safety Cable in the U.S., Do Not Remove
Knockouts In The Outlet Box.
Remove side covers from canopy
exposing 4 holes. 2 closed holes and 2
open “L” shape holes.
Flush Mount Installation
Side cover
Rubber pad
SAFETY CABLE INSTALLATION
Lag screw
Safety cable
Washer
Lock washer
Hook
Summary of Contents for 5TLR54 Series
Page 10: ...Mar 2015 ...