4
7
8
9
© 2022 Monte Carlo Fan Collections
1/2022
10
11
12
Slip downrod into motor housing yoke,
aligning holes and install cross pin and
keeper pin.
Insert cross pin through yoke and downrod
until point appears on the other side, and
insert keeper pin on cross pin.
Pull the downrod up tight against the
cross pin, and then evenly tighten the
downrod set screws on motor housing
yoke.
Place yoke cover on top housing of fan.
Warning
: Cross pin and keeper pin must
be installed securely, failure to install them
will result in serious injury.
Install ball end of downrod into mounting
bracket opening. Align (engage) slot on
ball with tab on mounting bracket.
Warning:
Failure to align slot on ball with
tab may result in serious injury.
Important
: If using the angle mount,
make sure open end of mounting bracket
is installed facing the higher point of the
ceiling and make sure the ceiling angle is
not steeper than 20º. Longer downrod
may be necessary allowing the fan blades
to rotate without obstructions.
Safety cable must be installed into the
house structure using 3” lag screws,
washers, and lock washers provided,
required for outdoor applications and in
Canada (All fans installed in Canada), and
for USA fan and light kit combinations
over 35lbs.
Make sure that when the safety cable is
fully extended the lead wires are longer
than the cable and no stress is placed on
the lead wires.
Note
: If Installing The Secondary Support
Safety Cable in the U.S., Do Not Remove
Knockouts In The Outlet Box.
SAFETY CABLE INSTALLATION
Lag screw
Safety cable
Washer
Lock washer
Cross pin
Keeper pin
Tab
Slot
After making the wire connections, the wires
should be spread apart with the grounded
conductor and the equipment-grounding
conductor on one side of the outlet box and
ungrounded conductor on the other side of
the outlet box. The splices after being made
should be turned upward and pushed carefully
up into the outlet box.
Lift Canopy allowing the 2 studs to
protrude through the canopy and install
the knurled nuts as shown. Tighten the
knurled nuts securely. The canopy should
adjust for any irregularity in the ceiling or
Outlet box.
Make sure the studs protruding from the
bottom of the Mounting bracket are
installed with threads all the way through
the bracket.
To Wall
Outlet Box
Black (Live)
Blue
White (Neutral)
Ground/Green
Ground/Green
White
Black
Blue
Grounded
wires
Ungrounded
wires
Stud
Refer to page 7
for wiring,
installation and operation of
Wall controller. Do not operate
the fan or light until it is
installed completely.
Summary of Contents for 3ERAR52 D Series
Page 9: ...Mar 2022...