background image

Monsoon S2 Dual Bay Reservoir Instructions: M2-D5P

CAUTION:  Your new reservoir has arrived assembled and ready for pump installation.  We do 
not recommend that you disassemble the reservoir unless necessary or you have previous 
mechanical experience.  Novice users or those unfamiliar with threads cut in plastic parts may 
have a tendency to over tighten screws and could possibly strip out the threads.  Every effort has 
been made to provide the strongest threads possible within the limitations of the materials used.  
To ensure all threads are in working order, we populate all threaded holes and ports prior to 
shipping.  Monsoon is not responsible for damage caused by over tightening of screws or fittings 
and all returned parts will be  inspected prior to the resolution of an RMA.  If you have damaged 
threads, replacement parts are available at your favorite reseller or directly from Monsoon.

Monsoon (like all manufacturers) assumes no responsibility for damage to your system caused by 
misuse or leaks.  It is the end user's responsibility to test for leaks prior to installation into their 
system and we highly recommend the use of a non-conductive fluid such as distilled water.  
Although we try to test our products for compatibility with every cooling fluid available, it is the 
responsibility of the end user to ensure that the fluid they choose to use is safe for use in this 
reservoir.  Materials used include plastics such as glass filled nylons, PVC, and acrylic.  Metals 
used include Aluminum (not usually in contact with fluid), Brass, and SAE 316 Stainless.  Rubber 
used in O rings is premium Silicone.

BOX CONTENTS: 

1. Assembled reservoir x 1
2. Machined aluminum motor mounting tube x 1
3. Machined aluminum motor mounting tube cap x 1
4. M3 x 6mm stainless case mounting screws x 8 
5. M3 stainless compression nuts for case mounting x 4
6. M3 black nylon washers for case mounting x 8
7. M4 x 4mm stainless motor tube cap set screws x 2
8. G ¼ machined brass plugs x 4 
9. Limited time only—Monsoon Silver Bullet Antimicrobial plugs x 2
10. Allen wrenches x 3

Please take a moment to look over your new reservoir and make sure and confirm all the parts listed 
above are present.

PUMP MOUNTING:

Since your reservoir ships with the machined aluminum pump mounting tube already installed onto the 
reservoir body, it is a good idea to rotate the mounting tube back and forth 3 or 4 turns before removing 
till you get an idea of how it “feels” when threaded on correctly.  Because the pump mounting tube has 
a large diameter with fine threads (M70 x 1mm) it is easier than normal to cross thread (locking the 
threads together in an uneven way) so extra care should be taken to ensure that you're threading the 
pump mounting tube on correctly.  

PAGE 1

Reviews: