Monsoon S2 Dual Bay Reservoir Instructions: M2-D5P
CAUTION: Your new reservoir has arrived assembled and ready for pump installation. We do
not recommend that you disassemble the reservoir unless necessary or you have previous
mechanical experience. Novice users or those unfamiliar with threads cut in plastic parts may
have a tendency to over tighten screws and could possibly strip out the threads. Every effort has
been made to provide the strongest threads possible within the limitations of the materials used.
To ensure all threads are in working order, we populate all threaded holes and ports prior to
shipping. Monsoon is not responsible for damage caused by over tightening of screws or fittings
and all returned parts will be inspected prior to the resolution of an RMA. If you have damaged
threads, replacement parts are available at your favorite reseller or directly from Monsoon.
Monsoon (like all manufacturers) assumes no responsibility for damage to your system caused by
misuse or leaks. It is the end user's responsibility to test for leaks prior to installation into their
system and we highly recommend the use of a non-conductive fluid such as distilled water.
Although we try to test our products for compatibility with every cooling fluid available, it is the
responsibility of the end user to ensure that the fluid they choose to use is safe for use in this
reservoir. Materials used include plastics such as glass filled nylons, PVC, and acrylic. Metals
used include Aluminum (not usually in contact with fluid), Brass, and SAE 316 Stainless. Rubber
used in O rings is premium Silicone.
BOX CONTENTS:
1. Assembled reservoir x 1
2. Machined aluminum motor mounting tube x 1
3. Machined aluminum motor mounting tube cap x 1
4. M3 x 6mm stainless case mounting screws x 8
5. M3 stainless compression nuts for case mounting x 4
6. M3 black nylon washers for case mounting x 8
7. M4 x 4mm stainless motor tube cap set screws x 2
8. G ¼ machined brass plugs x 4
9. Limited time only—Monsoon Silver Bullet Antimicrobial plugs x 2
10. Allen wrenches x 3
Please take a moment to look over your new reservoir and make sure and confirm all the parts listed
above are present.
PUMP MOUNTING:
Since your reservoir ships with the machined aluminum pump mounting tube already installed onto the
reservoir body, it is a good idea to rotate the mounting tube back and forth 3 or 4 turns before removing
till you get an idea of how it “feels” when threaded on correctly. Because the pump mounting tube has
a large diameter with fine threads (M70 x 1mm) it is easier than normal to cross thread (locking the
threads together in an uneven way) so extra care should be taken to ensure that you're threading the
pump mounting tube on correctly.
PAGE 1
Summary of Contents for M2 D5 Premium
Page 1: ......