background image

Summary of Contents for ZV42I

Page 1: ...Installation Instructions Island Vent Hoods Models ZV42I ZV54I 0 Monogram ...

Page 2: ...d on accidentally If the service panel cannot be locked fasten a tag or prominent warning label to the panel A ADVERTISSEMENT POUR REDUIRE LE RISQUE D INCENDIE DE CHOC ELECTRIQUEOU DE BLESSURES IL FAUT OBSERVERLES REGLESSUIVANTES A Utiliser cet appareil uniquement de la mani_re pr6vue par le fabricant En cas de question consulter le fabricant B Avant toute intervention ou nettoyage couper raliment...

Page 3: ...uctTransition and Damper 15 Step 6 InstallHoodto Support 15 Step 7 Connect Duct 15 Step 8 Connect Electrical 16 Step 9 Installthe Motor 16 Step 10 Slide DuctCover down 17 Step 11 InstallFilters 17 Step 12 InstallRods 17 Step 13 InstallSupplied DuctCover TopCover 18 Step 14 FinalizeInstallation 18 Step 15 InstallationChecklist 19 42 HOOD DIMENSIONS 54 HOOD DIMENSIONS Model ZV421 27 1 2 Supplied duc...

Page 4: ...accessory for your model at the same time as the vent hood and have on site before installation begins PRODUCT CLEARANCES 30 Min 36 Max 36 Min These vent hoods must be installed 30 min to 36 max above the cooking surface Exact installation height is determined by ceiling height The cooking surface should be at least 36 above the floor IMPORTANT Clearances may vary due to type of cooking product an...

Page 5: ...the hood Use shims on the ceiling joists or cross framing in the mounting hole locations This will allow the mounting screws to engage the recessed keyhole slots in the top of the hood See Step 2 POWER SUPPLY IMPORTANT Please read carefully WARNING FOR PERSONAL SAFETY THIS APPLIANCE MUST BE PROPERLYGROUNDED ATTENTION POUR DES RAISONS DE St_CURITt_ CET APPAREIL D01T ETRECORRECTEMENT MIS _ LA TERRE ...

Page 6: ...35 136 Kit 9 g 9 10 4 36 35 34 33 32 10 3 36 35 34 33 32 31 Order 10 2 36 35 34 33 32 31 30 ZX42DC10 10 1 35 34 33 32 31 30 2g Use Long 10 34 33 32 31 30 29 28 Support g 11 33 32 31 30 29 28 27 and 9 10 32 31 30 29 28 27 26 Duct Cover 9 9 31 30 29 28 27 26 25 9 8 30 29 28 27 26 25 24 9 7 2g 28 27 26 25 24 23 9 6 28 27 26 25 24 23 22 9 5 27 26 25 24 23 22 21 Order 9 4 26 25 24 23 22 21 20 ZX42DC10 ...

Page 7: ...rally vented systems follow the heating equipment manufacturer s guideEines and safety standards such as those published by NFPA and ASHRAE Hoods are supplied with a 10 round transition A locally supplied transition is required for other sizes Note Outletontop of hoodis 8 1 8 x 8 Actual length of straight duct plus duct fitting equivalent Equivalent length of duct pieces are baaed on actual tests ...

Page 8: ...EMOVE THE PACKAGING Remove the parts packages and packing materials Lift the hood out of the box IMPORTANT Uft the hood by grasping the outside edges of the exhaust opening on the top Pa_s l Pa_s Pa_s L s_ Hood Motor Mounted on Skid ShippingCa_un Place the hood on a protective surface to prevent scratches and damage to the stainless steel finish Carefully lay the hood on its side A support frame i...

Page 9: ... _ I contents Screws shown actual size f J 2Templates Screw F Blower safety screw and lock washer marked with red paint Phillips head M 6 x 16 Screws C 8 blunt point Phillips screws Screws A 4 7 16 hex head wood screws Screws B 2 1 8 x 1 1 2 Phillips pan head screws T Screws D 2 small Phillips head screws Screws E 2 Phillips head wood screws ACCESSORY PACKAGE Check accessory package Select the tal...

Page 10: ...nterof _ Cooktop Cooktop Front i T i _36 1 4 i Align With Center of _ Cooktop I j Cooktop 42 Hood SideView 54 Hood SideView Ceiling Support Structure At the hood location install 2 x 4 cross framing between ceiling joists as shown 2x4 s are required to support the weight of the hood EXAMPLE A 16 Joist Spacing Arrange cross framing in the ceiling to suit the existing structure Your ceiling joists w...

Page 11: ...ng Align duct Cooktop to center of Outline Coaktop Top View Ceiling Joists Run Perpendicular to Front of Hood EXAMPLE C 12 3 4 142 Hood 17 54 Hood 1stall Cross Framing Symmetrically About Duct Cooktop Centerline 2x4 Cross lming 8 5 8 16 Joist Spacing Align duct to center of Cooktop Cooktop Outline Top View Ceiling Joists at Angle with Front of Hood 11 ...

Page 12: ...e supported by the 2 x 4 cross framing 2x 4 Min CrossFraming Ceiling Joist i 17 54 Hood 12 3 4 42 Hood Ductwork Use the shortest and straightest duct route possible For satisfactory performance duct run should not exceed 150feet equivalent length for any duct configuration Refer to Duct Fittings chart to compute the maximum permissible length for duct runs to the outdoors This vent hood must use 1...

Page 13: ...deep Drive 4 Hex head wood screws Screws A into the center of the ceiling joists and cross framing Leave a 1 4 gap to allow the screw head to engage the keyhole slots on the support frames Cut the 10 1 2 duct opening through the sheet rock 0 Screws A ISTEP 3 SIZE AND INSTALL DUCTWORK Measure from house duct flange to bottom of support frame Subtract 4 3 8 for clearance to the bottom of the support...

Page 14: ...duct cover up and over the frame Secure the duct cover to the frame as shown using Screws D Locate and remove the safety stop screw Slide bottom duct cover up and over the top duct cover Align bottom duct screw hole to the hole in the frame Hold the duct cover in place while installing screw Screw Storage Location CAUTION The stop screw must be installed Failure to do so could result in personal i...

Page 15: ...hment Keyholes_ Back out the hanging screws on the bottom of the support frame to a 1 4 gap Lift the hood up to the support frame Carefully align the hood keyhole to the screws on the support frame Slide the hood to engage the keyhole slots lighten the screws Screws C Install safety screws into the top of the hood as shown Check hood level in both directions STEP 7 CONNECT DUCT Loosen duct collar ...

Page 16: ...wiring through strain relief and tighten Use wire nuts to connect incoming ground to green white to white and black to black Push wires into junction box and replace cover Be sure wires are not pinched ISTEP 91 INSTALL THE MOTOR Attachment Spring Slot Clip _l Attachment Screw and Washer Screw F Attachment Sprlng Slot Clip From the inside of the hood slip motor into the attachment slot on the left ...

Page 17: ...L FILTERS Place filter drip trays into the rear of the hood Insert the filter into the upper opening and drop into the trays To remove the filters grasp the knobs and push the filter up and lift out STEP 12_ INSTALL RODS Use a flat blade screwdriver to install stand offs into the bottom of the hood Align implement rod to stand offs with the screw hole towards the inside of the hood Secure the rod ...

Page 18: ...ever the top of the hood is visible TIP Place pieces of tape over ends of the cover to prevent scatching the duct cover Remove tape before installing screws Engage tabs into slots on each side at the top of the hood The covers should lay flat in the impression on top of the hood ScrewsC over Frontand Back Install 2 Screws C to secure the cover to the hood at the front and back ISTEP 141 FINALIZE I...

Page 19: ...nt assembly if needed Check that ductwork is 10 round If duct type is not rigid and less than 10 round inform the consumer that performance will be reduced Check Lighting Function Check that power cable is plugged into the junction box on top of the hood Turn halogen lamps to each setting Note change in brightness at different settings Check that each lamp bezel is secure Turn to the right to tigh...

Page 20: ...ur area call 1 800 444 1845 Note 1 roduct improv ment is a contintliilg endea or at General Electric Therefore mat rials appearanc and specificatkms are subject to change without notice Pub No 49 80209 1 Dwg No 64D4290P30 09 03 dR Monogram GE Consumer Products General Electric Company Louisvdlo KY 4022_ 2003 General Electric Company ...

Reviews: