Control card
Perform all six (6) insulation and resistance test steps required during installation:
1 Before breaking the security seal and opening the product.
Note:
Once the seal is broken, you are then in charge of the cable integrity throughout the
entire installation process. Be sure to follow instructions and observe all precautionary measures.
2 After the installation of the heating cable.
3 Before embedding the heating cable.
4 After embedding the heating cable.
5 After the final installation of floor covering.
6 Before connecting the heating cable system.
Enter results in the measurement table found in the envelope.
Affix the measurement table to the electrical panel, once completed.
Tableau de mesures
- Apposer au tableau électrique
Measurement table - Place in electrical panel
Résistance
Resistance
(Ω)
Isolation
Insulation
> 1MΩ
Résultats d’usine/Factory results
1. Avant de briser sceau/
Before breaking seal
2. Après pose câble/
After cable installation
3. Avant enrobage câble/
Before embedding cable
4. Après enrobage câble/
After embedding cable
5. Après pose finale revêtement/
After final surfacing
6. Avant raccordement système/
Before wiring system
11.52
OK