14.7 Mold Removal
1. Remove the bolts fastening the adapter plate to the mold.
2. Move stand horizontal adjustment fully back:
• Compact stand
- pull lever away from the injection molding machine
• Heavy duty stand
- move the linear rail fully back on the ball guides
and lock
3. Remove mold.
14.8 Disassembly
CAUTION
Do not move the stand with the unit installed without crane support.
CAUTION
1. Remove the screws fastening the adapter plate to the mold.
2. Move the stand horizontal adjustment fully back:
• Compact stand
- push lever away from the injection molding
machine
• Heavy duty stand
- move the linear rail fully back on the ball guides
and lock
3. Attach the lifting devices and crane to the E-Multi injection unit and stand
assembly and with the crane move the assembly away from the machine.
4. Remove screws fastening the stand to the E-Multi injection unit.
Figure 14-12 With the crane, lift the E-Multi injection unit up and away from the
stand.
5. For the heavy duty stand - adjust the stabilizing leg adjusting screw so the
stabilizing leg is not touching the floor.
6. Retract the level castor pads so the stand, on its own, can be rolled to
desired location on the castors.
14-11
E-MULTI STANDS
E-Multi User Manual