background image

PUMP/TANK CONNECTION MANIFOLD

MEDICAL ELECTRICAL EQUIPMENT

WITH RESPECT TO ELECTRICAL SHOCK, FIRE, MECHANICAL

AND OTHER SPECIFIED HAZARDS ONLY 

IN ACCORDANCE WITH UL-60601-1, CAN/CSA C22.2 NO.601.1  66CA

C

LA

SSIFIE

D

Pump/Tank Connection Manifold Using Accessory Kit

Flat Side Installed 

Facing Up

Compression 

Gasket Connector 

to Pump

1-1/2” FNPT to 

Sanitary Tee

Sanitary Tee with 1-1/2” FNPT End 

Fitting. 3 or 4 depending on system 

configuration. (Supplied by Plumber)

3” PVC or Copper 

Tubing & Elbow

(Supplied by Plumber)

1.5 ft

3 or 4 Supplied 

Check Valves -

See Kit

P/N 

MIK4

Check Valve Installed 

Flat Side Facing Up 

Horizontal to Floor

3” PVC or Copper 

Clean-out Plug Used with P/N 

MIK4

(Supplied by Plumber)

Air F

low

2” PVC or Copper 

Tubing for Tank Hose 

(Supplied by Plumber)

Check Valve Side 

View 

CT20 TANK INLET CONNECTION DETAIL

6-inch 

Riser

Customer-

Supplied Tee 

Connector

3/4 

FNPT

2” Flexible 

Coupling 

Connector

1/4-inch

 

Vacuum 

Sample Port to 

Master Controller

Reducing 

Bushing

Swivel 

Elbow

2” Pipe for 

connection 

to Facility 

Piping from 

Operatory.

Note: Hang using at least 3 pipe 

supports supplied by Plumber.

Hoses From 

Manifold To Pumps

Hose Between Manifold 

and CT20 / CT22 Tank

Secured by Flexible 

Couplers

V3, V5 & V7 

PUMP HOSE 

CONNECTION 

DETAIL

Hoses From 

Manifold To Pumps

Hose Between Manifold and 

CT20 / CT22 Tank Secured 

by Flexible Couplers

Hose from Manifold Connected to Pump 

via Air Input Filter Gasket Connector

1 ft

Summary of Contents for V3

Page 1: ..._____________________ Phone __________________________________________________ Dealer __________________________________________________ Dealer Address __________________________________________________ All installations must conform to local codes All pumps comply with NFPA 99C level 3 requirements System being installed AS CHECKED q V3 q V5 q V7 q 2V3 q 2V3CT q 2V5 q 2V5CT q 2V7 q 3V5 q 4V5 ...

Page 2: ...aust to Outside Vent V3 V5 or V7 Vacuum Pump Heat Exchanger Gate Valve Check Valve Sewer Drain MT10 Separator Tank Gas Typical MOJAVE System Installation Liquids Solids System Components V3 V5 V7 2V3 2V3CT 2V5 2V5CT 2V7 3V5 4V5 V3 Pump Assembly 1 0 0 2 2 0 0 0 0 0 V5 Pump Assembly 0 1 0 0 0 2 2 0 3 4 V7 Pump Assembly 0 0 1 0 0 0 0 2 0 0 MT10 MT12 Tank Assembly 1 1 1 1 0 1 0 0 0 0 CT20 CT22 Tank As...

Page 3: ... in 28 cm 13 5 in 34 cm 3 in 8 cm V3 V5 and V7 Vacuum Pump Dimensions 17 in 43 cm 25 in 64 cm 21 in 53 cm 17 5 in 44 cm 2V3 or 2V5 System Installation Recommended Stacked Pumps with Tank on Side 33 in 84 cm 34 in 86 cm V3 V5 and V7 System Dimensions 23 in 58 cm 50 in 127 cm 2V7 2V3CT or 2V5CT System Installation Recommended Stacked Pumps with CT20 CT22 Tank on Side 34 in 86 cm 50 in 127 cm MT10 MT...

Page 4: ... Height from Riser Trap to Main Line OVERHEAD INSTALLATION Alternate system installation layout should be used only when unable to use the sub floor plumbing layout Ceiling Junction Box See Note 2 1 2 Inch Diameter Riser Minimum Slope 1 4 inch per 10 Feet Main Line Riser for connection to tank input See Note 1 MAIN LINE See Notes 2 3 4 Junction Box See Note 2 MAIN LINE See Notes 2 3 4 5 CONNECTOR ...

Page 5: ...ng water pressure between 20 and 100 psi for daily tank washout Valve location must be no more than 10 feet from the tank installation to allow connection of supplied 10 foot 3 8 inch Poly tubing to the tank washout port Provisions for backflow prevention may be required Check local code requirements E MASTER CONTROLLER ELECTRIC OUTLET Master Controller requires a dedicated standalone 120V 5 AMP o...

Page 6: ... PVC Sch 40 2 PVC Sch 40 One 3 or two 2 PVC Sch 40 One 3 or two 2 PVC Sch 40 One 3 or two 2 PVC Sch 40 One 4 or three 2 PVC Sch 40 Two 3 or four 2 PVC Sch 40 Exhaust Vent Pipe Not Using Heat Exchanger See note 1 2 Metal Pipe 2 Metal Pipe 2 Metal Pipe One 3 or two 2 Metal Pipe One 3 or two 2 Metal Pipe One 3 or two 2 Metal Pipe One 4 or three 2 Metal Pipe Two 3 or four 2 Metal Pipe Minimum Suction ...

Page 7: ...rizontal to Floor 3 PVC or Copper Clean out Plug Used with P N MIK4 Supplied by Plumber Air F l o w 2 PVC or Copper Tubing for Tank Hose Supplied by Plumber Check Valve Side View CT20 TANK INLET CONNECTION DETAIL 6 inch Riser Customer Supplied Tee Connector 3 4 FNPT 2 Flexible Coupling Connector 1 4 inch Vacuum Sample Port to Master Controller Reducing Bushing Swivel Elbow 2 Pipe for connection to...

Page 8: ...ush Elbow 35 18 Exhaust Vent Protection If the exhaust piping is venting to the outside of the building precautions must be taken to protect the equipment room from weather elements and animal intrusion This can be accomplished by using one of the three methods shown on the right Wall Mounted Outside Vent Protection Shroud Screen Roof Mounted Outside Vent Protection Shroud Screen Screen Exhaust Ve...

Reviews: