5
4
6
4
Pre-install the urinal in the position where it needs to be installed,
correct the horizontal position with a spirit level, and then mark it
with a marker.
Install the hanging block on the wall, and tap the expansion bolts
into the holes at both ends of the drain hole.
Warning: Before drilling, make sure that there is no pipeline or
cable buried in the wall that needs to be punched.
Tear off the protective paper of the wax ring, and then stick the
wax ring on the drain port of the urinal. Align the wax ring with the
drain pipe and press it toward the pipe to ensure a good seal.
Remove the urinal, calculate the installation position of the hook up
according to the position where the expansion bolt is installed.
After marking with a marker, drill the hole and then insert it into
the expansion tube and clamp it tightly.
Warning: Before drilling, make sure that there is no pipeline or
cable buried in the wall that needs to be punched.
This step is only applicable to wall drainage products,
please refer to step 7B for floor drainage products.
3
Schematic diagram of upper water inlet installation
Schematic diagram of rear water inlet installation
The size of the flush valve shown on the left is for
reference only, and the actual size depends on
the specific product.
The size of the flush valve shown on the left is for
reference only, and the actual size depends on
the specific product.
Water inlet
Induction host
Drainage hole
Side view
Side view
Marker pen
Wall depth90mm
Hook up
Drainage hole
Hook up
Induction valve outlet
connection
Copper
takeover
Hose
具体尺寸请以实物为准
The actual size depends
on the specific product
具体尺寸请以实物为准
The actual size depends
on the specific product
单位:mm
Unit: mm
单位:mm
Unit: mm
130
130