Commissioning
20
11/06 AWB1251-1590GB
there are any divergences they are indicated by a slowly
flashing SmartWire LED (
X
Switch in the PROFIBUS-DP fieldbus.
As soon as the gateway is integrated into the PROFIBUS-
DP network the BUS LED will light up permanently.
X
Switch in the PROFIBUS-DP master. to “run”.
The Ready LED on the PROFIBUS-DP gateway switches
from flashing to permanently ON.
Meaning of the status
LEDs
The gateway SWIRE-GW-DP features four green status LEDs.
Ready-LED
U-Aux-LED
h
Valid data will only be sent via the PROFIBUS-DP to the
gateway once the PROFIBUS LED stays permanently ON.
a
Continuous
light
Supply voltage available
b
OFF
No supply voltage available for the
gateway and the SmartWire or internal
fault in the gateway
c
Fast flashing
New configuration has been activated
via the configuration button
d
Slow flashing
PROFIBUS-DP master im STOP mode
d
c
b
a
a
Continuous
light
Supply voltage available for the
contactor coils
b
OFF
No supply voltage available
b
a
Summary of Contents for SmartWire SWIRE-GW-DP
Page 12: ...8 11 06 AWB1251 1590GB...
Page 22: ...18 11 06 AWB1251 1590GB...
Page 26: ...22 11 06 AWB1251 1590GB...
Page 38: ...34 11 06 AWB1251 1590GB...
Page 45: ...Dimensions 41 11 06 AWB1251 1590GB Dimensions M4 7 5 35 5 7 5 90 102 110 105 109 4 5...
Page 46: ...42 11 06 AWB1251 1590GB...