![Moeller ps4-201-mm1 Hardware And Engineering Download Page 66](http://html1.mh-extra.com/html/moeller/ps4-201-mm1/ps4-201-mm1_hardware-and-engineering_1819300066.webp)
Operation
62
04/
99 AW
B
27-
1184 G
B
PC
→
PLC
When a program is transferred from the PC to the
PLC, the PS4-200 must be in the “Ready” or “Not
Ready” status. The setting of the operation mode
selector switch on the operator console is not
important.
왘
Transfer the program to the PLC; refer to the
manual “Sucosoft S 40 User Interface”
(AWB2700-1305GB, chapter 8).
If the operating mode selector switch is set to “Halt”
(stop), the LEDs for “Ready” and “Not Ready” will
light up while the program is being transferred
together with the LED for input I 0.0. They confirm
that the data transfer between the PS4-200 and the
PC is progressing successfully.
PC
→
PLC and memory module
왘
Plug the memory module into the PLC (the PLC
must be switched off).
왘
Switch on the PLC. The PLC must be switched to
the “Ready” or “Not Ready” status.
왘
Transfer the program from the PC to the PLC. The
program is now loaded into both the PLC and the
memory module.
Please refer to the section “Programming
through Suconet K” for details of how to transfer
the user program to the PLC through Suconet K.
Summary of Contents for ps4-201-mm1
Page 4: ...II 04 99 AWB 27 1184 GB...
Page 36: ...32 04 99 AWB 27 1184 GB...
Page 52: ...48 04 99 AWB 27 1184 GB...
Page 58: ...54 04 99 AWB 27 1184 GB...
Page 74: ...70 04 99 AWB 27 1184 GB...
Page 88: ...84 04 99 AWB 27 1184 GB...