
English
20
-
Install the supply socket in the wall. The supply socket be 220V. It is recommended to placed the
socket on the right above the heater. The height of the socket to the ground shall not be less than
1.8m (see Diagram 8). If there is fault on power cable, it should be replaced by MODENA,
agencies or qualified person who is able to do this so as to ensure the safety.
-
If the bathroom is too small, the heater can be installed at another place. However, in order
to
reduce the pipeline heat losses, the installation position of the heater shall be closed to
the
location shall be as near as possible to the heater.
3.2 Pipelines Connection
-
The dimension of each pipe part is G1/2 (
”BSP ½”) ; The massive pressure of inlet should use Pa
(Bar) as the unit; The minimum pressure of inlet should use Pa (Bar) as the unit.
-
Connection of pressure relief valve with the heater on the inlet of the water heater.
-
In order to avoid leakage when connecting the pipelines, the rubber seal gaskets provided with
the heater must be added at the end of the threads to ensure leak proof joints (see Diagram 9).
Summary of Contents for Disteso - ES 100HD
Page 2: ......
Page 8: ...Bahasa Indonesia 6 2 4 Diagram Listrik ES XXHD ES XXVD ...
Page 17: ......
Page 31: ...English 27 Note ...
Page 32: ...English 28 Note ...
Page 33: ...Note ...
Page 34: ......
Page 35: ......
Page 36: ......