Checking operation
60
Installation instructions
7.4 Checking the water inlet
1. Press the On Off ("I O") switch to "I".
The Main menu is displayed.
2. Tap the "Equipment functions" button.
3. Tap the "Water inlet" field.
4. Set the water inlet to "Warm water".
5. Set the water quantity to 5 l using the rollers.
6. Tap the "Start" field.
7. Check whether the water jet hits the edge of the pan.
8. Perform the same procedure for the cold water.
If the water jet hits the edge of the pan, screw the supplied
Perlator to the water inlet.
9. Fill out the commissioning report.
7.5 Checking the wastewater connection
7.5.1 Checking the wastewater line to a permanent connection
1. Fill the pan at least half full with water.
2. In the case of FlexiChef Team, fill the second pan at least half full
with water.
3. Open the drain and check that the filling funnel underneath the
pan does not overflow.
4. In the case of FlexiChef Team, open the drain of both pans at the
same time.
If the wastewater line can not discharge the water at this flow rate,
carry out the following measures:
5. Ensure that the water height in the waste trap is not more than 50
mm.
6. Vent the wastewater line.
7. If the cause lies in the sewer system in the building, contact the
water installer.
8. Fill out the commissioning report.
7.5.2 Checking a wastewater line with an unobstructed discharge
1. Fill the pan with water up to the top water fill level mark.
2. Tilt the pan and check that the floor gutter does not overflow.
3. If the floor gutter can not discharge the water at this flow rate,
contact the water installer.
4. Fill out the Commissioning report.
10000008311AINBEB
Summary of Contents for FlexiChef FCEKMP12 Series
Page 64: ...Putting the unit into service 64 Installation instructions 10000008311AINBEB ...
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ...www mkn com ...