14
120 Meteor Snowblower
Assembly Instructions
Parts for Assembly
• 2 pc Hood Bearing
• 4 pc 5/8” Wavewasher
(thin)
• 2 pc 5/8 x 2 1/4 UNF bolts
• 2 pc 5/8”UNF Locknut
• 1 pc 2 Hole Chute Clamp
• 1 page Assembly Instructions
Upon Receiving the Meteor Snowblower
The blowers are shipped in a packaged state
These Snowblowers are shipped without hood turner device
Carefully remove the chute and PTO shaft from the area of the snowblower auger and set
them aside. Locate the bag or package of small components.
Remove the ties that hold the Plastic Ring on the blower and place base of the chute on top of
the plastic ring. (Note: Plastic Ring can be lightly coated with grease at this time).
Take two 5/8 bolts and drop them through the holes in the chute clamp, turn the clamp upside
down while holding the bolts in the holes. Place a 5/8 Wavewasher on the bolt, then a 5/8
Bearing, finish with another 5/8 Wavewasher. Turn the clamp rightside up with the washers and
bearings on the bolts. Carefully insert the bolts into the chute base and secure with the lock-
nuts.
Install the PTO with the shearbolt yoke at the gearbox.
This will provide you with more space
when changing shearbolts.
Chute
Bolt
Clamp
Wave washer
Bearing
Plastic Ring
Summary of Contents for Meteor 120
Page 2: ...Intentionally Blank...
Page 17: ...17 For Smaller blowers rods are bent in as shown For Larger Blowers rods are Bent out as shown...
Page 26: ...26 1000 RPM GearBox Parts...
Page 32: ...32 PTO Installation Instructions for Snowblower...
Page 36: ...36 Effective PTO Drive Shaft Maintenance...
Page 42: ......
Page 43: ......