6
6.2 Redundant System Network Overview
6.2.4 CC-Link
6
- 36
1
OV
ER
VIE
W
2
SYS
TEM
CONFIGURA
TI
ON
3
TR
AC
KI
N
G
C
ABL
E
4
P
R
OCE
DURE
FO
R
S
TAR
TING
UP
A
RE
DUN
DAN
T
S
Y
S
T
E
M
5
RE
DUNDA
NT S
Y
S
T
E
M
FUNCTIONS
6
RE
DUN
DAN
T
S
Y
S
T
E
M
NE
TW
O
R
K
S
7
PR
OG
R
A
MM
IN
G
CA
UTIO
N
S
8
TR
O
U
BLE
S
HOOTING
(7) Cautions
(a) Station number setting
Set CC-Link master module station number so that station number 0 is assigned
to system A (master station), and other than station number 0 (standby master
station) is assigned to system B.
(b) Tracking device setting
Set a device that makes auto refresh setting to the CC-Link master module on the
extension base unit as a tracking device.
Do not set the link special relay (SB) and link special register (SW) as tracking
transfer device to the CC-Link master module mounted on the main base unit.
(c) When using CC-Link
When the CC-Link master module is mounted on main base unit, the redundant
system cannot start with the previous control system. (
Appendix 5)
(d) Parameters in the debug mode
In the debug mode, the CPU module uses the parameters for system A to
operate. Therefore, the station set as system B in the network parameters
becomes absent station (disconnected station).
(8) Output Holding Time of Remote Station at System Switching
When system switching occurs, the remote station output is held until system
switching is completed. (The remote station cannot be controlled from when system
switching occurs until it is completed.)
Use the expression shown in Table6.5 to calculate the remote station output holding
time (output holding time) at system switching occurrence.
* 1 : Use the value in Table6.6 as the error detection processing time.
Table6.5 Remote Station Output Holding Time
Reasons for System Switching
Output Holding Time Calculation Expression (ms)
Control system power off
•When (3 LS) > 100ms
(Output holding time) = (error detection processing time*1) + 100 + 6 LS + SS + (I/O
response time)
•When 100ms > (3 LS)
(Output holding time) = (error detection processing time*1) + 200 + 3 LS + SS + (I/O
response time)
Control system CPU module reset
Control system CPU module stop error
Control system CPU module hardware fault
System switching by GX Developer
•When (3 LS) > 100ms
(Output holding time) = (error detection processing time*1) + 300 + 6 LS + 2 SS + (I/O
response time)
•When 100ms > (3 LS)
(Output holding time) = (error detection processing time*1) + 400 + 3 LS + 2 SS + (I/O
response time)
System switching by system switching
instruction
System switching by system switching
request from network module
LS : Link scan time
Refer to the following manual for the link scan time calculation method.
CC-Link Master/Local Module User's Manual (Details)
SS : Sequence program scan time
Table6.6 Error Detection Processing Time
Transmission speed
Error detection processing time
10Mbps
5ms
5Mbps
8ms
2.5Mbps
15ms
625kbps
50ms
156 kbps
400ms