9. CONNECTION TO RKC TEMPERATURE CONTROLLER
9.3 Connection Diagram
9 - 35
C
O
NN
ECTION T
O
RK
C TEMPE
R
A
T
UR
E CON
T
R
O
LLER
9
(6) RS-485 connection diagram 6)
*1
Set the terminating resistor setting switch of the GOT main unit to "100 OHM".
■
Connecting terminating resistors
*2
When combining the module, because the communication line is connected between the modules with each other, wire only the
communication terminal on the both end of the combination module.
*3
Terminating resistor should be provided for a temperature controller which will be a terminal. When using X-TIO, turn ON the
terminating resistor selector in the terminal base. When combining the module, provide the terminating resistor to the end of the
combination module (the one that is far from the converter).
*4
For the terminal number of the temperature controller, refer to the following table.
Signal
name
Terminal No.
Z-TIO/
Z-CT
CB100/CB400
/CB500/CB900
CB700
FB100
FB400/FB90
RB100/RB400
/RB500/RB900
RB700
Communication 1
Communication 2
Communication 1
Communication 2
SG
5
13
7
13
16
25
25
13
25
T/R(A)
3
14
8
14
17
26
28
14
26
T/R(B)
4
15
9
15
18
27
29
15
27
GOT side
*1
(terminal block)
*4
*4
*4
*4
SDA1(TXD1+)
SDB1(TXD1-)
NC
SG
NC
NC
SDA2(TXD2+)
SDB2(TXD2-)
RDA2(RXD2+)
RDA1(RXD1+)
RDB2(RXD2-)
RDB1(RXD1-)
NC
RSA(RTS+)
NC
RSB(RTS-)
NC
CSA(CTS+)
NC
CSB(CTS-)
6
8
1
2
3
4
5
7
9
10
11
12
13
14
15
16
17
18
19
20
T/R(B)
T/R(A)
SG
T/R(B)
T/R(A)
SG
Temperature
controller
Temperature
controller
Temperature
controller
Temperature
controller
Combination module
*2
Combination module
*2
T/R(B)
T/R(A)
SG
T/R(B)
T/R(A)
SG
Terminating resistor(120Ω 1/2W)
*3
(More than 100Ω in case of CB series)
Signal
name
Terminal No.
PF900
PF901
AG500
HA400/401
HA900/901
MA900/
MA901
RMC500
X-TIO
SA100
SA200
SB1
B400
(RS-485
specifications)
Communication 1
Communication 2
SG
25
13
25
44
13
17
1
10
1
3/6
T/R(A)
26
14
26
45
14
16
2
11
2
1/5
T/R(B)
27
15
27
46
15
15
3
12
3
2/4
Summary of Contents for GOT2000Series
Page 2: ......
Page 17: ...A 15 REVISIONS WARRANTY...
Page 52: ...1 30 1 PREPARATORY PROCEDURES FOR MONITORING 1 6 Checking for Normal Monitoring...
Page 54: ......
Page 78: ...3 10 3 CONNECTION TO HITACHI PLC 3 6 Device Range that Can Be Set...
Page 100: ...4 22 4 CONNECTION TO FUJI PLC 4 7 Precautions...
Page 174: ...7 24 7 CONNECTION TO YOKOGAWA PLC 7 4 Device Range that Can Be Set...
Page 262: ...9 54 9 CONNECTION TO RKC TEMPERATURE CONTROLLER 9 7 Precautions...
Page 280: ...10 18 10 CONNECTION TO ALLEN BRADLEY PLC 10 4 Device Range that Can Be Set...
Page 296: ...11 16 11 CONNECTION TO GE PLC 11 7 Precautions...
Page 308: ...12 12 12 CONNECTION TO LS INDUSTRIAL SYSTEMS PLC 12 6 Device Range that Can Be Set...
Page 332: ...14 18 14 CONNECTION TO SIEMENS PLC 14 4 Device Range that Can Be Set...
Page 334: ...REVISIONS 2...
Page 337: ......