[1-4 Precautions for Wiring ]
12 -
chapter 1
HWE18240_GB
1 Check Before Servicing
2) Check the wires are securely fastened to the screw terminals.
Screw the screws straight down so as not to damage the screw threads.
Hold the two round terminals back to back to ensure that the screw will screw down straight.
After tightening the screw, mark a line through the screw head, washer, and terminals with a permanent marker.
Example
Poor contact caused by loose screws may result in overheating and fire.
Continued use of the damaged circuit board may cause overheating and fire.
Daisy-chain
Power supply terminal block, indoor-outdoor transmission line terminal block,
and centralized controller transmission line
Mark a line.
Place the round terminals back to back.
Power wires, transmission lines, centralized transmission lines
Summary of Contents for PUHY-HP120TNU-A
Page 1: ......
Page 11: ...HWE18240_GB ...
Page 27: ...HWE18240_GB ...
Page 59: ...HWE18240_GB ...
Page 69: ...HWE18240_GB ...
Page 87: ...HWE18240_GB ...
Page 109: ... 5 2 Outdoor Unit Control 22 chapter 5 HWE18240_GB 5 Control ...
Page 111: ...HWE18240_GB ...
Page 121: ...HWE18240_GB ...
Page 279: ...HWE18240_GB ...
Page 297: ...HWE18240_GB ...
Page 324: ......