background image

 

 9901025-2 

Page 7 of 21 

manufactured in accordance with the Pressure Equipment Directive and the installation 
must be carried out to a good standard of workmanship. Remove the protective plastic 
film on top of the air curtain before starting work. Use a heat sink on the copper pipes 
when brazing to reduce the transfer of heat to the inside of the air curtain where 
sensitive components are located. 
 

 

To gain access inside the Air Curtain 

 
To gain access for connection of the electrical supply, controls 
wiring and to work on the unit during commissioning, remove the 
air inlet grilles and the bottom access panel. 
 
First remove the plastic end caps if already fitted by pulling off to 
the side (see picture). 

 
 
Then remove each inlet grille in turn with its filter by unfastening 
the M4 Pozi Head screw at the bottom corner of the grille. Use a 
Pozi No.1 screwdriver to access the screw via the elongated 
hole at each bottom corner of the grille (see adjacent picture). 
 
 
 
 
 
To remove the bottom access panel unfasten the access panel 
securing screws, one at each end and two in the centre 
(PHV1500 and PHV2000 units) and slide the panel out forwards. 
 

Please note: All the panels of the air curtain are covered in a 
protective plastic film which should be removed. 

 
 

 

Electrical Supply to the Air Curtain 

This must be carried out AFTER the connection of the refrigerant pipework. All 
electrical wiring and connections MUST be carried out by a competent qualified 
electrician in accordance with the latest edition of the IEE wiring regulations 
and/or local statutory regulations. (see also Wiring Diagram on Page 10) 

 

 

A local isolator having a contact separation of at least 3mm on all poles must be 
fitted in the electrical supply to the air curtain and located in an accessible position 
adjacent to the unit. 1 phase if defrost electric heaters are not required. 3 phase if 
defrost electric heaters are required.  

 

The appliance must be connected using cables having an appropriate temperature 
rating (heat resistant). 

 

Ensure that the supply cables, circuit breakers and other electrical installation 
equipment are correctly sized for the air curtain being installed. See Table 
overleaf. 

 

A 20mm size cable gland or conduit connector should be used for the Electrical 
Supply into the air curtain. 

 

This appliance must be Earthed. 

access panel

location  
of screw 

Summary of Contents for PHV1000DXE HO

Page 1: ...CE INSTRUCTIONS For use with Mr Slim units PLEASE READ THESE INSTRUCTIONS CAREFULLY BEFORE ATTEMPTING INSTALLATION Thermoscreens Ltd St Mary s Road Nuneaton Warwickshire England CV11 5AU Email sales thermoscreens com Tel 44 0 24 7638 4646 Fax 44 0 24 7638 8578 www thermoscreens com English ...

Page 2: ...when the outdoor unit is in defrost mode so auxiliary electric element heaters if specified can provide partial heat back up during the few minutes of defrost The Air Curtain requires a permanent 3 phase electrical supply 3L N E from a local switched spur to provide power to the defrost cycle electric heating elements the air curtain fans and the Mitsubishi Electric Interface PCB If the defrost cy...

Page 3: ... Serial Number For warranty purposes proof of purchase is necessary so please keep a copy of your invoice IMPORTANT This Heat Pump Air Curtain in intended only for use with a Mitsubishi Electric Mr Slim Outdoor Unit for use on R410a with a condensing temperature of 49 C These instructions must be read in conjunction with the Mitsubishi Electric Mr Slim Outdoor Unit instructions All documentation s...

Page 4: ...table Air Curtain Weight kg PHV1000DXE HO 39 PHV1500DXE LO 59 PHV1500DXE HO 60 PHV2000DXE LO 78 PHV2000DXE HO 80 Step 1 Refer to Figure 1 for mounting details and drill the fixing points in the wall Step 2 Screw in the top wall bolts leaving a small gap between the head and the wall Lower the unit onto the bolts via the key hole slots in the top of the wall brackets and then screw in the bottom wa...

Page 5: ...frigerant Connection Liquid line Refrigerant Connection 100 Electrical Supply and Control Wiring Inlets for pipes 250 min PHV1000DX 1196 800 800 N A N A Optional sheet metal covers to hide pipework cables etc 250 500 or 1000 high Holes for M10 drop rods 4 for 1m unit 6 for 1 5m 2m units Use all drop rod holes FIGURE 1 DIMENSIONS OF PHV HEAT PUMP AIR CURTAIN ...

Page 6: ...st be carried out before connection of any electrical and controls cables and in accordance with the Instructions that come with the Mitsubishi Electric Outdoor Unit This work must only be undertaken by a Mitsubishi Electric approved Contractor Refrigerant installation pipework sizes are as follows Maximum Pipe Run Air Curtain Discharge Line Gas Liquid Line Length Height PHV1000 DXE HO 8 5 in 8 3 ...

Page 7: ...n the centre PHV1500 and PHV2000 units and slide the panel out forwards Please note All the panels of the air curtain are covered in a protective plastic film which should be removed Electrical Supply to the Air Curtain This must be carried out AFTER the connection of the refrigerant pipework All electrical wiring and connections MUST be carried out by a competent qualified electrician in accordan...

Page 8: ...EE Regulations The figure below shows the completed wiring for a 3 phase electrical supply if the defrost electric heaters are required 1 Connection from Mitsubishi Electric Outdoor Unit Connections to terminals S2 and S3 provide a communications link between the Mitsubishi Electric Outdoor Unit and the Air Curtain S1 in the Mitsubishi Electric Outdoor Unit is not used at all for this Air Curtain ...

Page 9: ... follows 1 2 3 1 0mm2 2 5mm2 max for access 0 75mm2 Do not use cable size of more than 2 5mm2 or connecting the cable is difficult Electrical details for the Mitsubishi Electric Mr Slim Outdoor Unit are as follows Mr Slim Outdoor Unit Electrical Supply V ph Hz Maximum Current per phase A Mitsubishi recommended BS88 Fuse Size A PUHZ RP71VHA 230 1 50 19 0 20 PUHZ RP100VHA 230 1 50 26 5 32 PUHZ RP100...

Page 10: ...OW SPEED CONTROLLER Local Electrical Supply for Defrost Electric Heaters and Fans PHV1000 7 8A per phase PHV1500 12 7A per phase PHV2000 15 7A per phase 400V 3ph 50Hz If Defrost Electric Heating Elements are not required disconnect neutral wire from A2 and terminate wire safely in auxiliary terminal 14NO L2 and L3 are not then needed L1 is then 230V 1ph 50Hz 1 3A for PHV1000DX 1 8A for PHV1500DX 2...

Page 11: ...face PCB on its mounting plate is held in place by a fixing screw located in the left hand end panel of the air curtain under the left hand plastic end cap Remove the screw and carefully slide the pcb partially out For easier withdrawal of the pcb the filter indicator connection may be temporarily removed Now go to either BMS Control or Manual Room Control to continue with the Commissioning of the...

Page 12: ...ating in heating mode Check that the air stream from the discharge warms up across the whole length of the air curtain after approximately 20 minutes and that the air stream reaches right down across the doorway with the door open or closed If necessary the vanes of the discharge grille can be angled either inwards or outwards if this gives better penetration warming of any incoming draughts Set u...

Page 13: ...Outdoor Unit and the Air Curtain commences approximately 30 seconds after power up After this time use the Room Control to switch on the fans Once the air curtain fans are operating check that they run at Low I Medium II and High III speeds using the manual 3 speed fan switch inside the left hand end of the air curtain Check there is no mechanical noise coming from the fans and that all fans are w...

Page 14: ...s and plastic end caps see To gain access inside the Air Curtain page 7 Power up both the Mitsubishi Electric Outdoor Unit and Air Curtain and re check the operation of the unit via the Manual Room Control Filter Dirty Indicator The air curtain is fitted with a Filter Dirty Indicator It is located at the left hand end of the outlet grille and signals when the air curtain inlet grille filters shoul...

Page 15: ...Before leaving site it is important that there is a Hand Over Meeting to hand over the heat pump system and air curtain installation to the end user or their representative This should include a full and clear explanation of how the system operates and a demonstration showing the air curtain running Be sure to explain the Filter Indicator Schedule that the air inlet grilles must be regularly vacuu...

Page 16: ... the Mitsubishi Interface PCB in the air curtain see Page 12 It is vital they understand that the air curtain must not be run in COOL or AUTO mode Ensure that all instructions and manuals are handed to the end user or their representative ...

Page 17: ... press of the Reset Button even if the indicator has not gone red Servicing the Air Curtain suggest every 3 Months or if the Filter Dirty Indicator shows FLASHING RED Always disconnect and isolate the mains electricity supply both at the local electrical supply to the Air Curtain and at the Mitsubishi Electric Outdoor Unit before servicing maintaining or repairing the Air Curtain Note All servicin...

Page 18: ...eir pockets and any foam insulation covering these pockets is un damaged Check the location of the thermal overheat cut out and air sensor and that the thermal overheat cut out switch has not tripped see Section Commissioning Page 11 Check all electrical connections and terminals within the unit are tight and that crimp connections have not become loose Refit the bottom access panel and air inlet ...

Page 19: ...n BMS Control Air curtain is set to FAN Ambient Check BMS schedule and change to HEAT if necessary Manual Control Manual Room Control Ambient Heat switch is set to FAN Ambient Use Room Control to adjust fan and heat settings as appropriate Fixed Target Temperature on dip switch SW2 on Mitsubishi interface pcb in air curtain is set too low for heating Manual Control Heat setting switch on Manual Ro...

Page 20: ...re they are correct although Thermoscreens Ltd disclaims all liability for damage resulting from any inaccuracies and or deficiencies in this documentation Thermoscreens Ltd retain the right to change the specifications stated in these instructions Thermoscreens Ltd St Mary s Road Nuneaton Warwickshire England CV11 5AU Email sales thermoscreens com Tel 44 0 24 7638 4646 Fax 44 0 24 7638 8578 www t...

Page 21: ...E LO PHV1500 DXE HO PHV1500R DXE HO PHV2000 DXE LO PHV2000R DXE LO PHV2000 DXE HO PHV2000R DXE HO Relevant EC Council the Machinery Directive 2006 42 EC the Low Voltage Directive 73 23 EEC as amended by 93 68 EEC the Electromagnetic Compatibility Directive 89 336 EEC as amended by 91 31 EEC and 93 68 EEC the Pressure Equipment Directive 97 23 EC Applied Harmonised Machinery EN 292 1 EN 292 2 EN 29...

Reviews: