1. Unit Components

Figure 1 Top view of the refrigerant pipes inside an outdoor unit

CJ5

CJ5

CJ4

CJ2 CJ1

B

C

A

I

H

J

G

F

D

CJ4

CJ3

E

Figure 2 Valve types allocations

A

: Refrigerant charge port (for automatic 

charging only)

B

: Check joint on the low-pressure side

A port through which additional refrigerant 
is charged after the completion of 
refrigerant oil recovery operation

C

: Service port on the high-pressure valve

Connecting port to the refrigerant circuit

• Evacuation port (high-pressure side)
• A port through which refrigerant for the 

indoor units is charged

D

: Service port on the low-pressure valve

Connecting port to the refrigerant circuit

• Evacuation port (low-pressure side)
• A port through which refrigerant for the 

indoor units is charged

E

: A valve to be closed after the completion 

of refrigerant oil recovery operation (BV3)
(Be sure to close this valve after the 
completion of refrigerant oil recovery 
operation.)

F

: High-pressure valve

G

: Low-pressure valve

H

: O/T

I

: ACC

J

: COMP

CJ3: Refrigerant charge port
CJ4: Oil sampling port
CJ5: Refrigerant oil discharge port

WT06218X01_en.fm  Page 2  Tuesday, December 14, 2010  4:19 PM

Summary of Contents for PERLACE MULTI PURY-RP200YJM-B

Page 1: ...LLECTE D HUILE MINÉRALE RÉCUPÉRATION DE L HUILE FRIGORIFIQUE MANUAL DE INSTRUCCIONES PARA LA RECOGIDA DE ACEITE MINERAL RECUPERACIÓN DE ACEITE REFRIGERANTE RACCOLTA DELL OLIO MINERALE RECUPERO DELL OLIO REFRIGERANTE MANUALE DI ISTRUZIONI MANUAL DE INSTRUÇÕES DE RECOLHA DE ÓLEO MINERAL RECUPERAÇÃO DO ÓLEO REFRIGERANTE Air Conditioners For Building Application Outdoor Unit PURY RP200 250 300YJM B BS...

Page 2: ...ort to the refrigerant circuit Evacuation port high pressure side A port through which refrigerant for the indoor units is charged D Service port on the low pressure valve Connecting port to the refrigerant circuit Evacuation port low pressure side A port through which refrigerant for the indoor units is charged E A valve to be closed after the completion of refrigerant oil recovery operation BV3 ...

Page 3: ...hen the pressure sensor reads 18 8 kg cm2 G Item No 58 The unit of pressure is in kg cm2G Use the following conversion formula to convert the displayed value into a value in SI unit MPa SI unit MPa Displayed value kg cm2 G 0 098 Flag display Each set of two lines in vertical alignment indicates a flag Example Outdoor unit in the 3 minute restart delay mode Item No 14 2 Table of items that can be m...

Page 4: ... BC controllers To calculate the required amount of refrigerant charged for the pipes refer to 10 1 Calculation of additional refrigerant charge in the installation manual on the CD ROM If there is excess refrigerant that cannot be charged use it during oil recovery operation at step 4 cooling operation After charging the required amount of refrigerant to the existing pipes open the valve so that ...

Page 5: ...is insufficient the units may stop during refrigerant oil recovery or it may take longer than usual to complete a test run 5Setting the unit address and checking for proper system operation Set the unit address turn on the power and check for proper operation of the system If an attempt is made to operate the outdoor unit before the refrigerant oil recovery operation is complete an error code 7116...

Page 6: ...igerant charge Do not exceed the maximum amount If the refrigerant oil recovery operation does not finish after the maximum amount of refrigerant is charged close the valve on refrigerant cylinder and wait for the operation to be completed automatically If the cylinder runs out of refrigerant during the refrigerant oil recovery operation continue the operation and replace the cylinder I If more th...

Page 7: ...pswitches 3 1 and 4 8 to ON in that order S 0 r 0 The refrigerant oil recovery operation is not completed To restart the refrigerant oil recovery operation set the dipswitches 3 1 and 4 8 to ON in that order 8Disconnecting the cylinder After completing the oil recovery operation close the valve on the cylinder and disconnect the cylinder within five minutes 9Recording the amount of refrigerant tha...

Page 8: ...Electromagnetic Compatibility Directive 2004 108 EC Pressure Equipment Directive 97 23 EC Please be sure to put the contact address telephone number on this manual before handing it to the customer HEAD OFFICE TOKYO BLDG 2 7 3 MARUNOUCHI CHIYODA KU TOKYO 100 8310 JAPAN Authorized representative in EU MITSUBISHI ELECTRIC EUROPE B V HARMAN HOUSE 1 GEORGE STAREET UXBRIDGE MIDDLESEX UB8 1QQ U K WT0621...

Reviews: