OPERATING PROCEDURE
PHOTOS
5. Removing the expansion valve
(1) Remove the service panel (Photo 1).
(2) Remove the top panel, the cabinet, and the back panel
(Photo 1, 2, 3).
(Gas recovery is not required if the unit is pumped down.)
(3) Remove the electrical parts for removing LEV R (Photo 4, 8).
(4) Remove the LEV coils.
(5) Detach the brazed parts of expansion valves and pipes.
100
Expansion
valves
Photo 11
LEV coils
OBH723C
Summary of Contents for MXZ-2E53VAHZ
Page 16: ...16 MXZ 4E83VA Unit mm Air in Air in Air in Air out OBH723C ...
Page 17: ...17 MXZ 5E102VA Unit mm Air in Air in Air in Air out OBH723C ...
Page 18: ...18 Unit mm MXZ 2E53VAHZ OBH723C ...
Page 19: ...19 MXZ 4E83VAHZ Unit mm OBH723C ...
Page 22: ...22 MXZ 4E83VA E1 OBH723C ...
Page 23: ...23 MXZ 4E83VA E2 OBH723C ...
Page 24: ...24 MXZ 4E83VA ET1 OBH723C ...
Page 25: ...25 MXZ 4E83VA ET2 OBH723C ...
Page 26: ...26 MXZ 4E83VA ER1 OBH723C ...
Page 27: ...27 MXZ 5E102VA E1 OBH723C ...
Page 28: ...28 MXZ 5E102VA E2 OBH723C ...
Page 29: ...29 MXZ 5E102VA ET1 OBH723C ...
Page 30: ...30 MXZ 5E102VA ET2 OBH723C ...
Page 31: ...31 MXZ 5E102VA ER1 OBH723C ...
Page 32: ...32 MXZ 2E53VAHZ E1 OBH723C ...
Page 33: ...33 MXZ 2E53VAHZ ER1 OBH723C ...
Page 34: ...34 MXZ 4E83VAHZ E1 OBH723C ...
Page 35: ...35 MXZ 4E83VAHZ ER1 OBH723C ...