![Mitsubishi Electric MELSEC Q80BD-J71GF11-T2 User Manual Download Page 51](http://html.mh-extra.com/html/mitsubishi-electric/melsec-q80bd-j71gf11-t2/melsec-q80bd-j71gf11-t2_user-manual_238449051.webp)
4 PROCEDURE BEFORE OPERATION
4.5 Tests Before Wiring (Standalone Tests of the Board)
49
4
Self-loopback test
Self-loopback test checks the hardware of the CC-Link IE Field Network board alone, including the send/receive circuit of the
transmission system and cables. The following shows a procedure for performing a test.
Operating procedure
When conducting the self-loopback test, use a normal Ethernet cable. (
1.
Connect Ethernet cables to the RJ45 connector
(PORT1) and RJ45 connector (PORT2) of the CC-Link
IE Field Network board.
2.
Select a board to be tested on the "Board Diagnostics"
screen in CC IE Field Utility (
3.
Set Mode to "Self-Loopback Test" and click the [Start
Test] button.
• Normal completion
• Abnormal completion
4.
The result is displayed on "Test Result" field.
If the test completes abnormally, replace the Ethernet cable
and execute the test again.
If the test is completed abnormally again, please consult your
local Mitsubishi representative.
Summary of Contents for MELSEC Q80BD-J71GF11-T2
Page 2: ......
Page 6: ...4 Disposal Precautions CAUTION When disposing of this product treat it as industrial waste ...
Page 118: ...116 12 MONITORING MEMO ...
Page 140: ...138 14 MELSEC DATA LINK LIBRARY MEMO ...
Page 142: ...140 15 PROGRAMMING 15 1 Precautions on Programming MEMO ...
Page 243: ...241 I U Utility 83 ...
Page 247: ......