5Maintenance and Inspection
Maintenance and inspection procedures
5-51
5.3 Maintenance and inspection procedures
The procedures for carrying out the periodic maintenance and inspection are described in this section.
Thoroughly read the contents, and follow the instructions. This work can be commissioned to the Mitsubishi
Service Department for a fee. (Never disassemble, etc., the parts not described in this manual.)
The maintenance parts, etc., required for the customer to carry out maintenance and inspection are
described in
Page 67, "5.5 Maintenance parts"
of this manual. Always contact your dealer when parts are
needed.
The origin of the machine system could deviate when this work is carried out.
"Review of the position data" and "re-teaching" will be required.
5.3.1 Robot arm structure
An outline structure drawing of the robot arm is shown below.
<RH-3CRH, RH-6CRH>
Fig.5-1:Outline structure drawing of robot arm (RH-3CRH, RH-6CRH)
CAUTION
㻨㻝㻪㻌
J1 axis motor
Base
㻨㻞㻪㻌
J2 axis motor
No.2 arm
No.1 arm
㻨㻟㻪㻌
J3 axis motor
㻨㻠㻪㻌
J4 axis motor
㻨㻣㻪㻌
Ball screw / spline
㻨㻥㻪㻌
J4 axis timing belt 1
㻨㻝㻜㻪㻌
J4 axis timing belt 2
㻨㻤㻪㻌
J3 axis timing belt
No.2 arm cover U
㻨㻡㻪㻌
J1 axis
reduction gears
㻨㻢㻪㻌
J2 axis reduction gears