e uip ent can cope with a ious en i on ents inc u ing te pe atu e changes an ib ations an se e as
the ajo i ing o ce on the p o uction site.
owe e e uip ent a e p ecision e ect onic e ices an a ai su en . a ticu a the
insta e
on the cont o pane su ace can be easi a ecte b e te na p essu e.
ai u es o e uip ent continue o a ong ti e p o ucti it a be consi e ab ete io ate . t is necessa
to esto e ai e e uip ent as soon as possib e.
he pe io o ti e u ing which e uip ent a e stoppe ue to ai u es is ca e own ti e .
hapte e p ains the o owing th ee basics o aintenance e ui e to aintain the no a status o the
. ac up
. a
. atte
4.1 NECESSITY OF MAINTENANCE
Summary of Contents for GOT 2000
Page 2: ......
Page 12: ......
Page 13: ...1 STEP 1 CREATING A PROJECT ...
Page 54: ......
Page 55: ...2 STEP 2 TRANSFERRING THE PROJECT DATA ...
Page 59: ...2 he wi be eboote auto atica he anguage se ection sc een appea s Se ect ng ish ...
Page 64: ......
Page 65: ...3 STEP 3 USING THE GOT ...
Page 77: ...4 STEP 4 MAINTAINING THE GOT ...
Page 141: ......