12 - 2
12. CLOCK SETTINGS AND BATTERY STATUS DISPLAY (TIME SETTING AND DISPLAY)
12.1 Time Setting and Display
Operation of time setting
(1) Clock setting
Setup the method to adjust the time between GOT clock data and the clock data of controller connected to the
GOT.
It is same as set in the GOT setup in Environmental Setting of GT Designer3.
GT Designer3 Version1 Screen Design Manual (Fundamentals)
POINT
POINT
POINT
(1) When connecting with an external device which does not have clock function.
If set to [Adjust] or [Broadcast] for [Clock setting] while the GOT is connected with external devices (PLC or
microcomputers) which do not have clock function, the clock data will not be adjusted.
For the list of PLC installed with clock function, refer to the following.
GOT1000 Series Connection Manual for GT Works3
(2) Setting of clock setting and battery
When selecting [Broadcast] or [None] in clock setting, set the clock of the GOT once with connecting a battery
to the GOT.
(3) Operation setting by GT Designer3
Carry out the setting of clock setting in [GOT set up] in [Environmental Setting] of GT Designer3.
To change a part of the setting after downloading the project data, change the setting at the display setting of
GOT.
GT Designer3 Version1 Screen Design Manual (Fundamentals)
Setting
Description
Adjust
Adjust the time of GOT clock data to the clock data of controller.
Broadcast
Adjust the time of controller clock data to the GOT clock data.
Adjust/Broadcast
Adjust the GOT and controllers to the controller whose clock data is used as a base.
None
No adjustment of clock data.
1.
Touching the setup item changes the setup
contents.
2.
Touching [OK] button reflects the setup contents.
Touching the [ ] button restarts the GOT.
After restarting, the GOT operates with the changed
setting.
Adjust
Broadcast
Adjust/Broadcast
None
Summary of Contents for Got 1000
Page 1: ......
Page 2: ......
Page 14: ...A 12 ...
Page 26: ...1 4 1 OVERVIEW 1 1 Features ...
Page 34: ...2 8 2 SYSTEM CONFIGURATION 2 2 System Equipment ...
Page 38: ...3 4 3 SPECIFICATIONS 3 3 Power Supply Specifications ...
Page 42: ...4 4 4 PARTS NAME 4 3 Rear Face ...
Page 54: ...6 6 6 INSTALLATION 6 5 Installation Procedure ...
Page 104: ...10 18 10 COMMUNICATION INTERFACE SETTING COMMUNICATION SETTING 10 3 Ethernet Setting ...
Page 226: ...13 92 13 FILE DISPLAY AND COPY PROGRAM DATA CONTROL 13 2 Various Data Control ...
Page 250: ...15 2 15 CLEANING DISPLAY SECTION CLEAN ...
Page 264: ...16 14 16 INSTALLATION OF COREOS BOOTOS AND STANDARD MONITOR OS 16 5 CoreOS ...
Page 272: ...17 8 17 MAINTENANCE AND INSPECTION 17 5 Backlight Shutoff Detection ...
Page 298: ...App 6 APPENDICES Appendix 1 External Dimensions ...
Page 302: ...App 10 APPENDICES Appendix 3 Transportation Precautions ...
Page 306: ...REVISIONS 2 ...
Page 309: ......
Page 310: ......