4. CONNECTION TO OMRON PLC
4.2 Serial Connection
4 - 21
1
P
R
EP
ARA
T
OR
Y
P
R
OCEDURES
FOR
MONIT
O
R
ING
2
C
O
NNECTION T
O
IAI
ROBO
T
CO
N
T
RO
L
L
E
R
3
CONNECTION T
O
AZBI
L C
O
NTR
O
L
EQUI
PMENT
4
CONNECTION T
O
OMRON PLC
5
CONNECTI
O
N T
O
OMRO
N TEMPERA
TURE
CONTROL
LE
R
6
CONNECTION T
O
KE
YENCE PL
C
7
CONNE
C
T
ION T
O
KO
YO
EI
PLC
8
CONN
E
CT
ION T
O
JT
EK
T PL
C
RS422 connection diagram 6)
(For GT16, GT15, GT14, GT12, GT11, GT105 , GT104 )
RS422 connection diagram 7)
(For GT16, GT15, GT14, GT12, GT11, GT105 , GT104 )
RS422 connection diagram 8)
(For GT16, GT15, GT14, GT12, GT11, GT105 , GT104 )
RS422 connection diagram 9)
(For GT1030, GT1020)
RS422 connection diagram 10)
(For GT1030, GT1020)
RS422 connection diagram 11)
(For GT1030, GT1020)
GOT side
OMRON PLC side
-
1
6
2
7
5
3
4
8
9
-
1
6
5
9
3
FG
SDA
SDB
RDA
RDB
SG
RSA
CSA
RSB
CSB
FG
RDB
RDA
SDB
SDA
SG
GOT side
OMRON PLC side
1
6
2
7
3
4
5
8
9
-
8
6
2
1
4
5
SDA
SDB
RDA
RDB
RSA
CSA
SG
RSB
CSB
FG
RDB
RDA
SDB
SDA
RS
CS
GOT side
OMRON PLC side
1
6
7
2
3
4
5
8
9
-
SDA
SDB
RDB
RDA
RSA
CSA
SG
RSB
CSB
FG
RDB+
RDA-
SDA-
SDB+
FG
GOT side
(terminal block)
OMRON PLC side
8
6
2
1
4
5
SDA
SDB
RDA
RDB
SG
RSA
RSB
CSA
CSB
RDB
RDA
SDB
SDA
RS
CS
GOT side
(terminal block)
OMRON PLC side
1
6
5
9
3
-
SDA
SDB
RDA
RDB
SG
RSA
RSB
CSA
CSB
RDB
RDA
SDB
SDA
SG
FG
GOT side
(terminal block)
OMRON PLC side
8
6
2
1
4
5
SDA
SDB
RDA
RDB
SG
RSA
RSB
CSA
CSB
FG
RDB
RDA
SDB
SDA
RS
CS
Summary of Contents for GOT 1000 Series
Page 2: ......
Page 76: ...1 46 1 PREPARATORY PROCEDURES FOR MONITORING 1 6 Checking for Normal Monitoring ...
Page 78: ......
Page 114: ...2 36 2 CONNECTION TO IAI ROBOT CONTROLLER 2 7 Precautions ...
Page 232: ...5 18 5 CONNECTION TO OMRON TEMPERATURE CONTROLLER 5 7 Precautions ...
Page 254: ...6 22 6 CONNECTION TO KEYENCE PLC 6 4 Device Range that Can Be Set ...
Page 404: ...14 14 14 CONNECTION TO PANASONIC SERVO AMPLIFIER 14 7 Precautions ...
Page 432: ...REVISIONS 3 ...
Page 435: ......