3 PROCEDURES UP TO OPERATION
21
3
3
PROCEDURES UP TO OPERATION
This chapter describes the procedures before operation.
1.
Check of FX5-DP-M specifications
Check the FX5-DP-M specifications. (
2.
Installation of FX5-DP-M
Install a FX5-DP-M to a CPU module. For details, refer to the following.
MELSEC iQ-F FX5U User's Manual (Hardware)
MELSEC iQ-F FX5UC User's Manual (Hardware)
3.
Wiring
Perform wiring of external devices to a FX5-DP-M.
4.
Adding a module
Add a FX5-DP-M to a module configuration by using GX Works3.
5.
Parameter settings
Set parameters of the FX5-DP-M by using PROFIBUS Configuration Tool and GX Works3.
6.
Programming
Create a program. (
Summary of Contents for FX5-DP-M
Page 1: ...MELSEC iQ F FX5 User s Manual PROFIBUS ...
Page 2: ......
Page 9: ...7 MEMO ...
Page 12: ...10 INDEX 168 REVISIONS 170 WARRANTY 171 TRADEMARKS 172 ...
Page 13: ...11 CONTENTS ...
Page 19: ...1 DESCRIPTION 17 1 MEMO ...
Page 100: ...98 9 PROGRAMMING 9 2 DP Master settings DP Slave FDL address 2 ...
Page 101: ...9 PROGRAMMING 9 2 DP Master settings 99 9 DP Slave FDL address 3 ...
Page 108: ...106 9 PROGRAMMING 9 8 Program Example of the Global Control Function ...
Page 109: ...9 PROGRAMMING 9 8 Program Example of the Global Control Function 107 9 ...
Page 110: ...108 9 PROGRAMMING 9 8 Program Example of the Global Control Function ...
Page 112: ...110 9 PROGRAMMING 9 9 Program Example of Acyclic Communication Acyclic Communication ...
Page 114: ...112 9 PROGRAMMING 9 10 Program Example of the Alarm Acquisition Function ...
Page 169: ...APPX Appendix 4 Processing Time 167 A MEMO ...
Page 175: ......