132
5. PARAMETERS
5.9 Parameter copy and parameter verification
5.9
Parameter copy and parameter verification
NOTE
• When the copy destination is other than the FR-CC2 series or when parameter copy is attempted after the parameter copy
reading was stopped, the model error "
" appears.
• Refer to the parameter list on
for the availability of parameter copy.
• When the power is turned OFF or an operation panel is disconnected, etc. during parameter copy writing, write again or check
the setting values by parameter verification.
• While password protection is enabled, parameter copy and parameter verification cannot be performed. (Refer to
.)
• If parameters are copied from an older converter unit to a newer converter unit that has additional parameters, out-of-range
setting values may be written in some parameters. In this case, the operation remains the same as the one in the initial setting.
5.9.1
Parameter copy
• Converter unit parameter settings can be copied to other converter units.
Reading the parameter settings in the converter and storing them in the
operation panel
Operating procedure
1.
Connect the operation panel to the source converter unit.
2.
Selecting the parameter setting mode
Press
to choose the parameter setting mode. (The parameter number read previously appears.)
3.
Selecting the parameter number
Turn
to "
" (Parameter copy), and press
.
"
" appears.
4.
Reading to and storing in the operation panel
Turn
to change the set value to "
". Press
to start reading the converter unit parameter settings
by the operation panel. (It takes about 30 seconds to read and store all the settings. During reading, "
"
blinks.)
5.
End of reading and storing
"
" and "
" are displayed alternately after the reading and storing are completed.
NOTE
• "
" appears when a parameter read error occurred. Perform the operation from step
3
again.
Pr.CPY setting value
Description
0.---
Initial display
1.RD
Copy the source parameters to the operation panel.
2.WR
The parameters copied to the operation panel can be also copied to the destination converter units.
3.VFY
Verify parameters in the converter unit and those in the operation panel. (Refer to