1
- 5
1.2 Rough Pre-operation Procedure
1.2 Rough Pre-operation Procedure
The outline procedure before operating GOT is shown.
* 1 Project data can be also downloaded/uploaded via Ethernet.
For download/upload of project data via Ethernet, BootOS and standard monitor OS should be installed in the
GOT in advance so that the GOT and PC can communicate with each other via Ethernet by setting
Communication Settings.
Refer to the following manual for details.
GT Designer2 Version Basic Operation/Data Transfer Manual (Chapter 8 TRANSFERRING DATA)
Start
Install GT Designer2 in the PC.
Create project data.
Wire for the GOT power supply.
Mount the option function board or multi-color
display board.
(As necessary)
Connect GOT and PC with a USB cable or
RS-232 cable.
Insert the memory card in the PC.
Install and download the OS program, project data
installed in the PC to the GOT.
1) Install standard monitor OS, communication driver,
extended function OS, option OS to the GOT.
After installation is completed, the GOT
automatically restarts.
2) Download the project data created by the PC.
*1
Write the OS, program, project data installed in the PC
in the memory card.
1) Write the standard monitor OS, communication
driver, extended function OS, option OS, project
data in the memory card.
Install the memory card to the GOT to install and
download the standard monitor OS, communication
driver, extended function OS, option OS, project data
to the GOT.
Mount units to GOT.
Check the Communication settings.
Connect the GOT and controller with a cable.
Turn on the power supply of GOT and
the system of the connection destination.
Start the monitor.
End
When transfer data via a cable.
When transfer data via the memory card.
Refer to Chapter 7 WIRING
Refer to Chapter 8 Option.
Refer to Chapter 8 OPTION.
Refer to GOT1000 Series Connection Manual.
Refer to GT Designer2 Version
Basic Operation/Data Transfer Manual
Refer to GT Designer2 Version Screen Design Manual
Refer to GT Designer2 Version
Basic Operation/Data Transfer
Manual
Refer to Chapter 18 INSTALLATION
OF COREOS, BOOTOS AND
STANDARD OS in this manual for
the operations of GOT.