13.3 Project Information
13.3.4 Operation of project information
13
- 23
9
UTILIT
Y
FUNCTION
10
COMMUNICA
TION
IN
TE
R
F
AC
E
SETTI
NG
11
D
IS
P
L
A
Y AN
D
OPE
R
AT
IO
N
SETTIN
G
S
12
CLOCK SE
TTI
N
GS
AND
BA
TTER
Y
ST
A
T
US DI
SPLA
Y
13
FIL
E
DI
SP
LA
Y
AND
COPY
14
G
O
T SE
L
F
C
H
EC
K
15
CLE
A
NING OF
DISPL
A
Y
S
E
CTION
16
MA
INTENANCE
TIME N
O
TI
FICA
T
IO
N
SETTI
NG
(2) Setup operation
Sets the project data stored in the A drive (Standard CF Card) or B drive (Extended memory card)
to be used in the GOT.
The GOT monitors using the data in the A drive or B drive.
(This item explains using the A drive.)
Before setup operation
When storing project data from GT Designer2 to CF card, select [A: Standard CF
Card] for [Project Data] in [Boot Drive].
1
Install a CF card in the GOT.
For how to install a CF card, refer to the
following.
2
Touch [A: Standard CF Card] in Select
drive.
3
If touch the
button, the dialog
mentioned left is displayed.
If touch
button, the setup is
executed.
4
When the setup is completed, the dialog
mentioned left is displayed.
Touching the
button restarts the
GOT.
Download
OK
OK